Study on the behavior of an ultra-large section tunnel project in unconsolidated ground-design and construction of the Minoh toll road tunnel

被引:0
|
作者
Taketomo, K. [1 ]
Mitarashi, Y. [2 ]
Shiokawa, H. [2 ]
Nishimura, S. [2 ]
Konishi, K. [2 ]
机构
[1] Osaka Prefectural Rd Publ Corp, Minoh Site Off, Osaka, Japan
[2] Kumagai Gumi Co Ltd, Tokyo, Japan
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper discusses the Minoh tunnel construction. The geology at its south portal is unconsolidated soil, with a high groundwater level. A significant amount of water inflow was therefore anticipated. In such adverse ground, this tunnel with a maximum excavation section of 313 m 2, which is one of the largest sections in Japan, was successively constructed using the side-drift advance method with various new techniques. During tunneling, informatics technologies were fully utilized, by feeding back various measurement results to design and construction, thereby enabling selection of suitable auxiliary stabilizing techniques and excavation methods. The auxiliary methods involved were pipe roof (812.8 mm in diameter, 90 m long), long steel pipe forepiling, and long face bolts. In addition, "quasi-high fluidity concrete" was used to place high quality lining.
引用
收藏
页码:1085 / +
页数:2
相关论文
共 47 条
  • [41] Study on construction mechanic characteristics and construction optimization of super-large cross-section tunnel portal under shallow buried depth and asymmetrical loading: A case study in Southwest China
    Chen, Hao
    Zheng, Haozan
    Liu, Bolong
    Huang, Man
    Liu, Jiawei
    PLOS ONE, 2025, 20 (01):
  • [42] Evaluating the Impact of Blast-Induced Damage on the Rock Load Supported by Liner in Construction of a Deep Shaft: A Case Study of Ventilation Shaft of Micangshan Road Tunnel Project
    Fang, Yong
    Yao, Zhigang
    Walton, Gabriel
    Zhou, Jian
    Xu, Wanghao
    Zheng, Yuchao
    ADVANCES IN CIVIL ENGINEERING, 2020, 2020
  • [43] Interface Temperature Field of Freezing Method Construction for a Super-Large Diameter Shield Tunnel Connecting Channel: A Case Study of Beijing East Sixth Ring Renovation Project
    Li, Ming
    Wang, Lei
    Cui, Hao
    Chen, Honglei
    Sun, Changsong
    Yang, Zhe
    Tunnel Construction, 2025, 45 (02) : 352 - 360
  • [44] Construction of Tunnel T-49A on Dharam – Qazigund section of Udhampur-Srinagar-Baramulla New BG railway line project in highly adverse geological conditions- A case study
    Khali, Rakesh Kumar
    Yalal, Sharanappa
    Tunnelling for a Better Life - Proceedings of the ITA-AITES World Tunnel Congress, WTC 2024, 2024, : 1507 - 1516
  • [45] Elaborate numerical analysis and new fibre Bragg grating monitoring methods for the ground pressure in shallow large-diameter shield tunnels: a case study of the yellow crane tower tunnel project
    Fan, Leyang
    Cui, Lan
    Zhu, Zeqi
    Sheng, Qian
    Zheng, Junjie
    Dong, Youkou
    BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2025, 84 (02)
  • [46] A case study in the application of T. R. c. M and C. A. M-construction of station with a large section tunnel below underground shopping centre
    Kim, Chang Su
    Cho, Young Ho
    Cho, Hyun
    Park, Dong In
    ACUUS2009: PROCEEDINGS OF 12TH INTERNATIONAL CONFERENCE OF THE ASSOCIATED RESEARCH CENTERS FOR URBAN UNDERGROUND SPACE, 2009, : 517 - 520
  • [47] DEVELOPMENT AND TRIALS OF 400KV INTEGRAL PIPE-COOLED SYSTEM STUDY OF MECHANICAL-BEHAVIOR OF CABLES IN INTEGRAL-PIPE WATER-COOLED SYSTEMS AND DESIGN AND CONSTRUCTION OF 400KV CABLE SYSTEM FOR SEVERN TUNNEL - DISCUSSION
    CHERRY, DM
    BANKS, J
    BARNES, CC
    OLIVER, AJ
    PAPADOPULOS, MS
    BIRD, WE
    GREGORY, B
    PESCHKE, E
    MALBURG, PG
    BARTON, AH
    ARNAUD, UC
    BURTON, J
    CROCKETT, AE
    NICHOLSON, JA
    ARKELL, CA
    BLAKE, WE
    BREALEY, ADR
    HACKE
    HANCE, GEA
    PROCEEDINGS OF THE INSTITUTION OF ELECTRICAL ENGINEERS-LONDON, 1978, 125 (10): : 1015 - 1020