Production run time problem with machine breakdowns under AR control policy and rework

被引:0
|
作者
Chiu, Singa Wang [1 ,2 ]
机构
[1] Chaoyang Univ Technol, Dept Business Adm, Taichung 413, Taiwan
[2] Feng Chia Univ, Coll Business, Dept Int Trade, Taichung 407, Taiwan
来源
关键词
abort/resume policies; defective items; machine breakdowns; manufacturing; production run time; rework;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper examines the production run time problem with random machine breakdowns under abort/ resume (AR) policy and reworking of defective items produced. Under AR policy, production of interrupted lot will be immediately resumed when breakdown is fixed and machine is restored. Mathematical modeling and derivation of the production- inventory cost functions for both systems with/without breakdowns are presented. These cost functions are integrated and long-run average cost per unit time is obtained. Theorems on convexity and oil bounds of run time are proposed and proved. A recursive searching, algorithm is developed for locating optimal run time within the bounds. Numerical example with sensitivity analysis is provided to assist in optimal operational Control Of Such ail unreliable system.
引用
收藏
页码:979 / 988
页数:10
相关论文
共 50 条
  • [31] An integrated replenishment and production control policy under inventory inaccuracy and time-delay
    Li, Ming
    Wang, Zheng
    COMPUTERS & OPERATIONS RESEARCH, 2017, 88 : 137 - 149
  • [32] Producer's replenishment policy for an EPQ model with rework and machine failure taking place in backorder reloading time
    Chen, Kuang-Ku
    Chiu, Yuan-Shyi Peter
    Ting, Chia-Kuan
    WSEAS Transactions on Mathematics, 2010, 9 (04) : 223 - 233
  • [33] On a production-inventory system of deteriorating items subject to random machine breakdowns with a fixed repair time
    Lin, GC
    Gong, DC
    MATHEMATICAL AND COMPUTER MODELLING, 2006, 43 (7-8) : 920 - 932
  • [34] A simple solution procedure for solving the multi-delivery policy into economic production lot size problem with partial rework
    Chung, K. -J.
    Ting, P. -Sh.
    Cardenas-Barron, L. E.
    SCIENTIA IRANICA, 2017, 24 (05) : 2640 - 2644
  • [35] Optimal common cycle time for a multi-item production system with discontinuous delivery policy and failure in rework
    Chiu, Yuan-Shyi Peter
    Lin, Hong-Dar
    Cheng, Feng-Tsung
    Hwang, Ming-Hon
    JOURNAL OF SCIENTIFIC & INDUSTRIAL RESEARCH, 2013, 72 (07): : 435 - 440
  • [36] Location Problem of Production and Sales under Carbon Tax Policy
    Xiang, Chong
    Li, Xiaoshen
    Sun, Guanglei
    5TH ANNUAL INTERNATIONAL CONFERENCE ON INFORMATION SYSTEM AND ARTIFICIAL INTELLIGENCE (ISAI2020), 2020, 1575
  • [37] Run Time Assurance for Spacecraft Attitude Control Under Nondeterministic Assumptions
    Abate, Matthew
    Mote, Mark
    Dor, Mehregan
    Klett, Corbin
    Phillips, Sean
    Lang, Kendra
    Tsiotras, Panagiotis
    Feron, Eric
    Coogan, Samuel
    IEEE TRANSACTIONS ON CONTROL SYSTEMS TECHNOLOGY, 2024, 32 (03) : 862 - 873
  • [38] Optimization of Schedule Stability and Efficiency Under Processing Time Variability and Random Machine Breakdowns in a Job Shop Environment
    Goren, Selcuk
    Sabuncuoglu, Ihsan
    Koc, Utku
    NAVAL RESEARCH LOGISTICS, 2012, 59 (01) : 26 - 38
  • [39] UNCERTAIN OPTIMAL CONTROL PROBLEM OF PRODUCTION AND INVENTORY UNDER TIME-VARYING CUSTOMER DEMAND
    Li, Zixuan
    Ye, Tingqing
    Jin, Ting
    Song, Yifu
    Xiao, Shijun
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2025, 21 (03) : 2175 - 2193
  • [40] Determining an optimal production run length with an extended quality control policy for an imperfect process
    Shih, Neng-Hui
    Wang, Chih-Hsiung
    APPLIED MATHEMATICAL MODELLING, 2016, 40 (04) : 2827 - 2836