共 50 条
- [3] Optimal production run time for an imperfect production inventory system with rework, random breakdowns and inspection costs Operational Research, 2021, 21 : 167 - 204
- [9] Determining an optimal replenishment run time and lot size for an imperfect manufacturing system and rework under markdown policy The Journal of Analysis, 2019, 27 : 493 - 514
- [10] Determining an optimal replenishment run time and lot size for an imperfect manufacturing system and rework under markdown policy JOURNAL OF ANALYSIS, 2019, 27 (02): : 493 - 514