Single machine batch scheduling with sequential job processing

被引:38
|
作者
Cheng, TCE [1 ]
Kovalyov, MY
机构
[1] Hong Kong Polytech Univ, Dept Management, Kowloon, Hong Kong, Peoples R China
[2] Natl Acad Sci Belarus, Inst Engn Cybernet, Minsk 220012, BELARUS
关键词
D O I
10.1023/A:1011005314354
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The problem of scheduling n jobs on a single machine in batches to minimize some regular cost functions is studied. Jobs within each batch are processed sequentially so that the processing time of a batch is equal to the sum of the processing times of the jobs contained in it. Jobs in the same batch are completed at the same time when the last job of the batch has finished its processing. A constant set-up time precedes the processing of each batch. The number of jobs in each batch is bounded by some value b. If b < n, then the problem is called bounded. Otherwise, it is unbounded. For both the bounded and unbounded problems, dynamic programming algorithms are presented for minimizing the maximum lateness, the number of late jobs, the total tardiness, the total weighted completion time, and the total weighted tardiness when all due dates are equal, which are polynomial if there is a fixed number of distinct due dates or processing times. More efficient algorithms are derived for some special cases of both the bounded and unbounded problems in which all due dates and/or processing times are equal. Several special cases of the bounded problem are shown to be NP-hard. Thus, a comprehensive classification of the computational complexities of the special cases is provided.
引用
收藏
页码:413 / 420
页数:8
相关论文
共 50 条
  • [31] On the complexity of bi-criteria scheduling on a single batch processing machine
    L. L. Liu
    C. T. Ng
    T. C. E. Cheng
    Journal of Scheduling, 2010, 13 : 629 - 638
  • [32] An ACO-based intercell scheduling approach for job shop cells with multiple single processing machines and one batch processing machine
    Li, Dongni
    Meng, Xianwen
    Li, Miao
    Tian, Yunna
    JOURNAL OF INTELLIGENT MANUFACTURING, 2016, 27 (02) : 283 - 296
  • [33] Scheduling a batch processing machine with non-identical job sizes: a clustering perspective
    Chen, Huaping
    Du, Bing
    Huang, George Q.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (19) : 5755 - 5778
  • [34] An ACO-based intercell scheduling approach for job shop cells with multiple single processing machines and one batch processing machine
    Dongni Li
    Xianwen Meng
    Miao Li
    Yunna Tian
    Journal of Intelligent Manufacturing, 2016, 27 : 283 - 296
  • [35] Scheduling jobs with agreeable processing times and due dates on a single batch processing machine
    Liu, L. L.
    Ng, C. T.
    Cheng, T. C. E.
    THEORETICAL COMPUTER SCIENCE, 2007, 374 (1-3) : 159 - 169
  • [36] Single batch-processing machine scheduling problem with interval grey processing time
    Xie, Naiming
    Qin, Yihang
    Chen, Nanlei
    Yang, Yingjie
    APPLIED SOFT COMPUTING, 2025, 170
  • [37] Single-machine scheduling with deteriorating functions for job processing times
    Cheng, T. C. E.
    Lee, Wen-Chiung
    Wu, Chin-Chia
    APPLIED MATHEMATICAL MODELLING, 2010, 34 (12) : 4171 - 4178
  • [38] Scheduling a single machine with multiple job processing ability to minimize makespan
    Wang, X.
    Tang, L.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2011, 62 (08) : 1555 - 1565
  • [39] Scheduling batches with sequential job processing for two-machine flow and open shops
    Glass, CA
    Potts, CN
    Strusevich, VA
    INFORMS JOURNAL ON COMPUTING, 2001, 13 (02) : 120 - 137
  • [40] A note on minimizing makespan on a single batch processing machine with nonidentical job sizes
    Kashan, Ali Husseinzadeh
    Karimi, Behrooz
    Ghomi, S. M. T. Fatemi
    THEORETICAL COMPUTER SCIENCE, 2009, 410 (27-29) : 2754 - 2758