Critical factors for total quality management implementation in the Brazilian construction industry

被引:13
|
作者
Pereira Reinaldo, Livia da Silveira [1 ]
Vieira Neto, Julio [1 ]
Gusmao Caiado, Rodrigo Goyannes [2 ,3 ]
Goncalves Quelhas, Osvaldo Luiz [4 ]
机构
[1] Univ Fed Fluminense, Dept Management Syst, Niteroi, RJ, Brazil
[2] Pontifical Catholic Univ Rio de Janeiro, Tecgraf Inst, Rio De Janeiro, Brazil
[3] Univ Fed Fluminense, Sustainable Management Syst, Niteroi, RJ, Brazil
[4] Univ Fed Fluminense, Prod Engn, Niteroi, RJ, Brazil
来源
TQM JOURNAL | 2021年 / 33卷 / 05期
关键词
Total quality management (TQM); Critical success factors (CSFs); Construction industry; Brazil; CRITICAL SUCCESS FACTORS; SUSTAINABILITY; PERFORMANCE; INSTRUMENT; TQM;
D O I
10.1108/TQM-05-2020-0108
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose This paper aims to identify the critical success factors (CSFs) that affect the implementation of total quality management (TQM) and to investigate, from the perspective of Brazil, the latent factors for TQM implementation in the construction industry. Design/methodology/approach The methodology consists of two methods. First, a literature review was conducted to identify CSFs for TQM implementation. Then, empirical research was conducted from a survey questionnaire applied to 130 professionals who have experience in the Brazilian construction industry. SPSS version-25 was used for data analysis, using descriptive statistics, and, finally, principal component analysis for identifying the latent factors. Findings The study findings portray convergences regarding the practitioners' perception in the light of the 20 critical factors identified in the literature, which can serve to make construction professionals aware of the key factors to TQM implementation. In addition, two latent factors, quality practices and human factor were identified, and they can assist the leaders and decision-makers for the implementation of TQM in the construction industry of a developing country. Originality/value It fills the gap of practical studies that compare the academic and practitioners' perspectives regarding the CSFs for TQM implementation in construction industry.
引用
收藏
页码:1001 / 1019
页数:19
相关论文
共 50 条
  • [41] Exploring critical success factors for collaborative contracting implementation in the Singapore construction industry
    Zhang, Na
    Hwang, Bon-Gang
    Deng, Xiaopeng
    Tay, Fiona
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (02) : 919 - 938
  • [42] Organizational culture and total quality management practices in Indian construction industry
    Patyal, Vishal Singh
    Ambekar, Sudhir
    Prakash, Anand
    INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2020, 69 (05) : 895 - 913
  • [43] Impact of total quality management on the sustainable performance in the Palestinian construction industry
    Jabi, Ismael
    Faour, Maryana
    Saleh, Yahya
    TQM JOURNAL, 2024,
  • [44] Critical factors for green supply chain management implementation in footwear industry
    Pai, Fan-Yun
    Yeh, Tsu-Ming
    Chen, Yu-Yueh
    INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2025,
  • [45] Critical project management success factors analysis for the construction industry of Bangladesh
    Datta, Shuvo Dip
    Sobuz, Md. Habibur Rahman
    Nafe Assafi, Mohammad
    Sutan, Norsuzailina Mohamed
    Islam, Md. Nazrul
    Mannan, Maria Binte
    Akid, Abu Sayed Mohammad
    Hasan, Noor Md. Sadiqul
    INTERNATIONAL JOURNAL OF BUILDING PATHOLOGY AND ADAPTATION, 2023,
  • [46] Relationships between total quality management critical techniques in automotive industry
    Azizi, Amir
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND OPERATIONS MANAGEMENT (IEOM), 2015,
  • [47] A study of the relationships between total quality management implementation factors and software quality
    Parzinger, MJ
    Nath, R
    TOTAL QUALITY MANAGEMENT, 2000, 11 (03): : 353 - 371
  • [48] Total quality management in the construction industry in Hong Kong: A supply chain management perspective
    Wong, A
    Fung, P
    TOTAL QUALITY MANAGEMENT, 1999, 10 (02): : 199 - 208
  • [49] Total quality management in industry
    Anon
    Automotive Engineering International, 1993, 101 (06): : 35 - 41
  • [50] THE IMPLEMENTATION OF TOTAL QUALITY MANAGEMENT
    Braicu, Cezar
    METALURGIA INTERNATIONAL, 2010, 15 : 166 - 168