A fast exact pricing algorithm for the railway crew scheduling problem

被引:2
|
作者
van Rossum, B. T. C. [1 ,2 ]
机构
[1] Erasmus Univ, Erasmus Ctr Optimizat Publ Transport, Rotterdam, Netherlands
[2] Erasmus Univ, Econometr Inst, Rotterdam, Netherlands
关键词
Railway optimization; Crew scheduling; Column generation; Pricing problem; Shortest path problem with resource; constraints; COLUMN GENERATION;
D O I
10.1016/j.orl.2022.10.011
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
The railway crew scheduling problem consists of selecting a least cost set of duties that cover all tasks. Large-scale crew scheduling problems are typically solved with column generation, where in each iteration a pricing problem needs to be solved. When the duty constraints consist in a maximum duty length, a meal break constraint, and the requirement to start and end at the same crew depot, the fastest known exact pricing algorithm has O(|N|3) complexity, |N| being the number of tasks. In this work we propose an O(|N|2) exact pricing algorithm. We compare the two algorithms on randomly generated instances and show that a reduction in computation time of 95% is attained on instances of size |N| =1, 250. (c) 2022 The Author(s). Published by Elsevier B.V. This is an open access article under the CC BY license (http://creativecommons.org/licenses/by/4.0/).
引用
收藏
页码:707 / 711
页数:5
相关论文
共 50 条
  • [21] MODELLING AND OPTIMISATION OF RAILWAY CREW SCHEDULING
    Hanafi, Rosmalina
    BULLETIN OF THE AUSTRALIAN MATHEMATICAL SOCIETY, 2015, 92 (02) : 348 - 350
  • [22] Modeling and Algorithms of the Crew Scheduling Problem on High-speed Railway Lines
    Tian, Zhiqiang
    Song, Qi
    INTELLIGENT AND INTEGRATED SUSTAINABLE MULTIMODAL TRANSPORTATION SYSTEMS PROCEEDINGS FROM THE 13TH COTA INTERNATIONAL CONFERENCE OF TRANSPORTATION PROFESSIONALS (CICTP2013), 2013, 96 : 1443 - 1452
  • [23] Multiobjective Genetic Algorithm to Solve the Train Crew Scheduling Problem
    Jian, Ming-Shen
    Chou, Ta-Yuan
    NEW ASPECTS OF SYSTEMS THEORY AND SCIENTIFIC COMPUTATION, 2010, : 100 - +
  • [24] A branch-and-price algorithm for a hierarchical crew scheduling problem
    Faneyte, DBC
    Spieksma, FCR
    Woeginger, GJ
    NAVAL RESEARCH LOGISTICS, 2002, 49 (08) : 743 - 759
  • [25] AN APPROACH TO THE CREW SCHEDULING PROBLEM
    EDWARDS, GR
    NEW ZEALAND OPERATIONAL RESEARCH, 1980, 8 (02): : 153 - 171
  • [26] Railway crew scheduling: Models, methods and applications
    Heil, Julia
    Hoffmann, Kirsten
    Buscher, Udo
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2020, 283 (02) : 405 - 425
  • [27] RAILROAD CREW SCHEDULING PROBLEM
    DEMASCO, JM
    SNYDER, PW
    OPERATIONS RESEARCH, 1975, 23 : B323 - B323
  • [28] Crew scheduling and rostering problems in railway applications
    Caprara, A
    Fischetti, M
    Guida, PL
    Toth, P
    Vigo, D
    OPERATIONS RESEARCH AND DECISION AID METHODOLOGIES IN TRAFFIC AND TRANSPORTATION MANAGEMENT, 1998, 166 : 228 - 243
  • [29] Heuristic for Railway Crew Scheduling With Connectivity of Schedules
    Bansal, Akshat
    Anoop, Kezhe Perumpadappu
    Rangaraj, Narayan
    TRANSPORTATION RESEARCH RECORD, 2024, 2678 (08) : 873 - 887
  • [30] A new pricing scheme for airline crew scheduling
    Makri, A
    Klabjan, D
    INFORMS JOURNAL ON COMPUTING, 2004, 16 (01) : 56 - 67