Hierarchical Benders Decomposition for Open-Pit Mine Block Sequencing

被引:11
|
作者
Vossen, Thomas W. M. [1 ]
Wood, R. Kevin [2 ]
Newman, Alexandra M. [3 ]
机构
[1] Univ Colorado, Leeds Sch Business, Boulder, CO 80309 USA
[2] Naval Postgrad Sch, Dept Operat Res, Monterey, CA 93943 USA
[3] Colorado Sch Mines, Dept Mech Engn, Golden, CO 80401 USA
关键词
industries: mining; production scheduling: deterministic; sequencing; integer programming: Benders decomposition; heuristic; BRANCH-AND-PRICE; NESTED DECOMPOSITION; PROGRAMMING MODEL; ALGORITHM; IMPLEMENTATIONS;
D O I
10.1287/opre.2016.1516
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The open-pit mine block sequencing problem (OPBS) models a deposit of ore and surrounding material near the Earth's surface as a three-dimensional grid of blocks. A solution in discretized time identifies a profit-maximizing extraction (mining) schedule for the blocks. Our model variant, a mixed-integer program (MIP), presumes a predetermined destination for each extracted block, namely, processing plant or waste dump. The MIP incorporates standard constructs but also adds not-so-standard lower bounds on resource consumption in each time period and allows fractional block extraction in a novel fashion while still enforcing pit-wall slope restrictions. A new extension of nested Benders decomposition, "hierarchical" Benders decomposition (HBD), solves the MIP's linear-programming relaxation. HBD exploits time-aggregated variables and can recursively decompose a model into a master problem and two subproblems rather than the usual single subproblem. A specialized branch-and-bound heuristic then produces high-quality, mixed-integer solutions. Medium-sized problems (e.g., 25,000 blocks and 20 time periods) solve to near optimality in minutes. To the best of our knowledge, these computational results are the best known for instances of OPBS that enforce lower bounds on resource consumption.
引用
收藏
页码:771 / 793
页数:23
相关论文
共 50 条
  • [21] Buckling failure at an open-pit coal mine
    Aydan, O
    Ulusay, R
    Kumsar, H
    Ersen, A
    EUROCK '96/TORINO/ITALY - PREDICTION AND PERFORMANCE IN ROCK MECHANICS AND ROCK ENGINEERING, PROCEEDINGS, VOLS 1 AND 2, 1996, : 641 - 648
  • [22] Open-Pit Mine Optimization with Maximum Satisfiability
    Matthew Deutsch
    Mining, Metallurgy & Exploration, 2019, 36 : 757 - 764
  • [23] Open-Pit Mine Optimization with Maximum Satisfiability
    Deutsch, Matthew
    MINING METALLURGY & EXPLORATION, 2019, 36 (04) : 757 - 764
  • [24] CUTOFFS GRADE CALCULATION FOR THE OPEN-PIT MINE
    JOHN, T
    CIM BULLETIN, 1984, 77 (863): : 91 - 91
  • [25] SLOPE DESIGN OF AN OPEN-PIT COPPER MINE
    SINGH, VK
    BALIGA, BD
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES & GEOMECHANICS ABSTRACTS, 1994, 31 (01) : 55 - 69
  • [26] Update on open-pit coal mine blasting
    Adhikari, G.R.
    Gupta, R.N.
    Singh, R.B.
    Journal of Mines, Metals and Fuels, 1987, 35 (06): : 219 - 222
  • [27] A sliding time window heuristic for open pit mine block sequencing
    Christopher Cullenbine
    R. Kevin Wood
    Alexandra Newman
    Optimization Letters, 2011, 5 : 365 - 377
  • [28] OPEN-PIT MINE AT ASBESTOS-HILL
    ROUSSIN, R
    CIM BULLETIN, 1976, 69 (775): : 70 - 74
  • [29] A sliding time window heuristic for open pit mine block sequencing
    Cullenbine, Christopher
    Wood, R. Kevin
    Newman, Alexandra
    OPTIMIZATION LETTERS, 2011, 5 (03) : 365 - 377
  • [30] Computer-aided mine planning for an open-pit mine
    Solanki, M.K.S.
    Kanodia, H.K.
    Journal of the Institution of Engineers (India), Part MI: Mining Engineering Division, 1990, 71 (02):