Handling ties in heuristics for the permutation flow shop scheduling problem

被引:36
|
作者
Vasiljevic, Dragan [1 ]
Danilovic, Milos [1 ]
机构
[1] Univ Belgrade, Fac Org Sci, Dept Operat Management, Belgrade 11001, Serbia
关键词
Scheduling; Constructive heuristic; Permutation flow shop; Makespan; NEH heuristic; PARTICLE SWARM OPTIMIZATION; TABU SEARCH ALGORITHM; MINIMIZE MAKESPAN; VERSION;
D O I
10.1016/j.jmsy.2014.11.011
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The NEH heuristic, as the most efficient procedure for the flow shop scheduling problem is based on constructing a sequence of jobs by iteratively inserting the non-scheduled jobs into a current subsequence. The initial phase of NEH, in which an initial order (priority order) of jobs is defined, and the insertion procedure, usually cause a high number of ties. Unlike the sort of ties in the insertion phase, the ties in the initial phase are not uniquely defined by the definition of NEH. This results in an inaccuracy in most of the large number of published experimental results on this topic. The experimental research, presented in this paper confirms the importance of the inclusion of the information about the sort of ties in the initial phase in any experimental result related to NEH. The conclusion, obtained by this study, is that the range of the objective values for different sorts of ties is often greater than the improvements, published in literature. This allowed us to construct a very simple algorithm that outperforms published NEH improvements, maintaining NEH's exceptional efficiency. The proposed algorithm also uses the information about the ties in the insertion phase to improve the objective value. The permutation flow shop problem primarily concerns the makespan objective, but the main conclusions can be applied to other flow shop problems as well. (C) 2014 The Society of Manufacturing Engineers. Published by Elsevier Ltd. All rights reserved.
引用
收藏
页码:1 / 9
页数:9
相关论文
共 50 条
  • [11] EFFICIENT ALGORITHM FOR LOT PERMUTATION FLOW SHOP SCHEDULING PROBLEM
    Dodu, Cristina Elena
    Ancau, Mircea
    PROCEEDINGS OF THE ROMANIAN ACADEMY SERIES A-MATHEMATICS PHYSICS TECHNICAL SCIENCES INFORMATION SCIENCE, 2021, 22 (03): : 231 - 238
  • [12] Deployment of Solving Permutation Flow Shop Scheduling Problem on the Grid
    Kouki, Samia
    Jemni, Mohamed
    Ladhari, Talel
    GRID AND DISTRIBUTED COMPUTING, CONTROL AND AUTOMATION, 2010, 121 : 95 - +
  • [13] A New Robust Scheduling Model for Permutation Flow Shop Problem
    Liao, Wenzhu
    Fu, Yanxiang
    RECENT ADVANCES IN INTELLIGENT MANUFACTURING, PT I, 2018, 923 : 308 - 317
  • [14] A Hybrid Algorithm for a Robust Permutation Flow Shop Scheduling Problem
    Ni, Zhengbin
    Wang, Bing
    Wu, Bo
    PROCEEDINGS OF THE 32ND 2020 CHINESE CONTROL AND DECISION CONFERENCE (CCDC 2020), 2020, : 3802 - 3807
  • [15] ALGORITHMS FOR BICRITERIA MINIMIZATION IN THE PERMUTATION FLOW SHOP SCHEDULING PROBLEM
    Mokotoff, Ethel
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2011, 7 (01) : 253 - 282
  • [16] A Parallel Distributed Algorithm for the Permutation Flow Shop Scheduling Problem
    Kouki, Samia
    Ladhari, Talel
    Jemni, Mohamed
    ALGORITHMS AND ARCHITECTURES FOR PARALLEL PROCESSING, PT 2, PROCEEDINGS, 2010, 6082 : 328 - +
  • [17] Improvement Tools for NEH Based Heuristics on Permutation and Blocking Flow Shop Scheduling Problems
    Companys, Ramon
    Ribas, Imma
    Mateo, Mane
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: NEW CHALLENGES, NEW APPROACHES, 2010, 338 : 33 - 40
  • [18] Facility Location Problem and Permutation Flow shop Scheduling Problem: A Linked Optimisation Problem
    Ogunsemi, Akinola
    McCall, John
    Kern, Mathias
    Lacroix, Benjamin
    Corsar, David
    Owusu, Gilbert
    PROCEEDINGS OF THE 2022 GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE COMPANION, GECCO 2022, 2022, : 735 - 738
  • [19] Efficient heuristics for the hybrid flow shop scheduling problem with missing operations
    Dios, Manuel
    Fernandez-Viagas, Victor
    Framinan, Jose M.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 115 : 88 - 99
  • [20] Heuristics for solving flow shop scheduling problem under resources constraints
    Laribi, Imane
    Yalaoui, Farouk
    Belkaid, Faycal
    Sari, Zaki
    IFAC PAPERSONLINE, 2016, 49 (12): : 1478 - 1483