共 50 条
- [31] Multi-mode Time-Cost-Robustness Trade-Off Project Scheduling Problem under Uncertainty PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 302 - 306
- [32] Approximate Algorithm for Fast Capacity Provisioning in WANs with Trade-Off between Performance and Cost under Budget Constraint PROCEEDINGS OF THE NINTH INTERNATIONAL CONFERENCE ON DEPENDABILITY AND COMPLEX SYSTEMS DEPCOS-RELCOMEX, 2014, 286 : 211 - 221
- [33] Great power comes at a high (locomotor) cost: the role of muscle fascicle length in the power versus economy performance trade-off JOURNAL OF EXPERIMENTAL BIOLOGY, 2021, 224 (21):
- [34] Cost-Risk Trade-Off of Mitigation and Solar Geoengineering: Considering Regional Disparities Under Probabilistic Climate Sensitivity ENVIRONMENTAL & RESOURCE ECONOMICS, 2019, 72 (01): : 263 - 279
- [35] Solving multi-mode time-cost-quality trade-off problems under generalized precedence relations OPTIMIZATION METHODS & SOFTWARE, 2015, 30 (05): : 965 - 1001
- [36] Cost-Risk Trade-Off of Mitigation and Solar Geoengineering: Considering Regional Disparities Under Probabilistic Climate Sensitivity Environmental and Resource Economics, 2019, 72 : 263 - 279
- [37] Multi-objective optimization of FCA welding process: trade-off between welding cost and penetration under hardness limitation The International Journal of Advanced Manufacturing Technology, 2020, 110 : 729 - 740
- [38] Multi-objective optimization of FCA welding process: trade-off between welding cost and penetration under hardness limitation INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2020, 110 (3-4): : 729 - 740
- [39] Multiproject Time-cost Trade-off Scheduling Problem for Large-scale Construction Systems under Fuzzy Uncertainty 2015 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING - 22ND ANNUAL CONFERENCE PROCEEDINGS, VOLS I AND II, 2015, : 282 - 292