ASSESSMENT OF CHANGE ORDER IMPACT FACTORS ON CONSTRUCTION PROJECT PERFORMANCE USING ANALYTIC HIERARCHY PROCESS (AHP)

被引:12
|
作者
Gunduz, Murat [1 ]
Mohammad, Khaled Omar [1 ]
机构
[1] Qatar Univ, Dept Civil Engn, POB 2713, Doha, Qatar
关键词
change orders; construction industry; analytic hierarchy process; relative importance index; PRODUCTIVITY;
D O I
10.3846/tede.2019.11262
中图分类号
F [经济];
学科分类号
02 ;
摘要
Complexity is very high in construction project and constrained by money and time. Change orders are commonly required during the execution of construction projects. They may increase, omit or adjust tasks in the project. Change orders affect the performance of construction job because they disturb current jobs and affect their schedule. The motive behind this study is to outline a complete assessment on change orders impacts. A review on past studies was performed to capture change order factors that affect project performance. Literature review and interviews with the industry professionals were used to finalize the factors into 16 critical factors. A questionnaire was distributed to industry specialists to capture the effect of these 16 factors on project performance. Complete answers of 102 surveys were received. Analytic Hierarchy Process (AHP) and Relative Important Index (RII) were utilized to analyze the responses. This study differs from other past studies by studying change order impact factors on three different change order types namely additional, omission and substitutional works. The most important change orders impacts factors as per the analysis outcomes are increased project management efforts, increased project replanning, loss of efficiency due to work interruption, increased reworks/demolition works and delay of payments. This paper would help construction professionals to recognize change order impacts and would assist them in taking proactive actions to limit these impacts.
引用
收藏
页码:71 / 85
页数:15
相关论文
共 50 条
  • [21] Examination of thai construction safety factors using the analytic hierarchy process
    Chinda, Thanwadee
    International Journal of Smart Home, 2015, 9 (07): : 285 - 292
  • [22] Effective Framework for Change Order Management Using Analytical Hierarchy Process (AHP)
    Gunduz, Murat
    Khan, Omar Hafeez
    GAZI UNIVERSITY JOURNAL OF SCIENCE, 2018, 31 (04): : 1079 - 1091
  • [23] ANALYSIS OF THE IMPACT OF THE ECOLOGICAL ENVIRONMENT ON THE RAILWAY CONSTRUCTION BASED ON ANALYTIC HIERARCHY PROCESS (AHP) AND PROBABILITY STATISTICS
    Du, Haixia
    Li, Zhenzhen
    FRESENIUS ENVIRONMENTAL BULLETIN, 2021, 30 (09): : 10718 - 10727
  • [24] Approaching IT Automation Decisions using Analytic Hierarchy Process (AHP)
    Iskin, Ibrahim
    Daim, Tugrul U.
    Noble, Stephen
    Baltz, Angie
    INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY PROJECT MANAGEMENT, 2014, 5 (01) : 77 - 89
  • [25] Prioritizing HAZOP analysis using analytic hierarchy process (AHP)
    Mohamad Rizza Othman
    Rosshila Idris
    Mimi Haryani Hassim
    Wan Hanisah Wan Ibrahim
    Clean Technologies and Environmental Policy, 2016, 18 : 1345 - 1360
  • [26] Prioritization of Research Proposals Using the Analytic Hierarchy Process - AHP
    Martins dos Santos Oliveira, Deise Rocha
    Naas, Irenilza de Alencar
    Martins Barros, Flavio Margarito
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS, APMS 2013, PT II, 2013, 415 : 347 - 352
  • [27] Modeling Intellectual Capital Using Analytic Hierarchy Process (AHP)
    Agoston, Simona
    Dima, Alina Mihaela
    PROCEEDINGS OF THE 4TH EUROPEAN CONFERENCE ON INTELLECTUAL CAPITAL, 2012, : 1 - 9
  • [28] Prioritizing HAZOP analysis using analytic hierarchy process (AHP)
    Othman, Mohamad Rizza
    Idris, Rosshila
    Hassim, Mimi Haryani
    Ibrahim, Wan Hanisah Wan
    Clean Technologies and Environmental Policy, 2016, 18 (05) : 1345 - 1360
  • [29] Knowledge Dynamics Modeling Using Analytic Hierarchy Process (AHP)
    Bratianu, Constantin
    Agapie, Adriana
    Orzea, Ivona
    PROCEEDINGS OF THE 3RD EUROPEAN CONFERENCE ON INTELLECTUAL CAPITAL, 2011, : 94 - 102
  • [30] Building Cost Control Model of Assembly Construction Project Using Analytic Hierarchy Process
    Jiang, Min
    2020 5TH INTERNATIONAL CONFERENCE ON SMART GRID AND ELECTRICAL AUTOMATION (ICSGEA 2020), 2020, : 576 - 580