Distributed coordination of project schedule changes using agent-based compensatory negotiation methodology

被引:6
|
作者
Kim, KS [1 ]
Paulson, BC
Levitt, RE
Fischer, MA
Petrie, CJ
机构
[1] Daewoo E&C Co Ltd, Daewoo Inst Construct Technol, Kyonggi Do 440210, South Korea
[2] Stanford Univ, Dept Civil & Environm Engn, Stanford, CA 94305 USA
[3] Stanford Univ, Stanford Networking Res Ctr, Stanford, CA 94305 USA
[4] Daewoo E&C Co Ltd, Daewoo Inst Construct Technol, Kyonggi Do 440210, South Korea
[5] Stanford Univ, Dept Civil & Environm Engn, Stanford, CA 94305 USA
[6] Stanford Univ, Stanford Networking Res Ctr, Stanford, CA 94305 USA
来源
AI EDAM-ARTIFICIAL INTELLIGENCE FOR ENGINEERING DESIGN ANALYSIS AND MANUFACTURING | 2003年 / 17卷 / 02期
关键词
compensatory negotiation; distributed coordination; project scheduling; software agent;
D O I
10.1017/S0890060403172022
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In the construction industry, projects are becoming increasingly large and complex, necessitating multiple subcontractors. Traditional centralized coordination techniques used by general contractors become insufficient as subcontractors perforin most work and provide their own resources. When subcontractors cannot provide enough resources, they hinder their own performance, that of other subcontractors, and ultimately the entire project. Thus, projects need a new distributed coordination approach wherein all of the concerned subcontractors can respond to changes and reschedule a project dynamically. This paper presents a new distributed coordination framework for project schedule changes (DCPSC) that is based on an agent-based negotiation approach wherein software agents evaluate the impact of changes, simulate decisions, and give advice on behalf of the human subcontractors. A case example demonstrates the significance of the DCPSC. It compares two centralized coordination methodologies used in current practice to the DCPSC framework. We demonstrate that our DCPSC framework always finds a solution that is better than or equal to any of two centralized coordination methodologies.
引用
收藏
页码:115 / 131
页数:17
相关论文
共 50 条
  • [1] Agent-based compensatory negotiation methodology to facilitate distributed coordination of project schedule changes
    Kim, K
    Paulson, BC
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2003, 17 (01) : 10 - 18
  • [2] Compensatory negotiation for agent-based project schedule coordination
    Kim, K
    Paulson, BC
    Petrie, CJ
    Lesser, VR
    FOURTH INTERNATIONAL CONFERENCE ON MULTIAGENT SYSTEMS, PROCEEDINGS, 2000, : 405 - 406
  • [3] Multi-agent distributed coordination of project schedule changes
    Kim, KS
    Paulson, BC
    COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2003, 18 (06) : 412 - 425
  • [4] Negotiation and Coordination in Carpooling: Agent-Based Simulation Model
    Hussain, Iftikhar
    Knapen, Luk
    Yasar, Ansar-UI-Haque
    Bellemans, Tom
    Janssens, Davy
    Wets, Geert
    TRANSPORTATION RESEARCH RECORD, 2016, (2542) : 92 - 101
  • [5] Learning as a methodology for partner selection in agent-based negotiation
    Pereira, G
    Oliveira, E
    CONCURRENT ENGINEERING: ENHANCED INTEROPERABLE SYSTEMS, 2003, : 135 - 141
  • [6] Agent-based software architecture for simulating distributed negotiation
    Murthy, VK
    KNOWLEDGE-BASED INTELLIGENT INFORMATION AND ENGINEERING SYSTEMS, PT 1, PROCEEDINGS, 2005, 3681 : 212 - 218
  • [7] The KODAMA methodology: An agent-based distributed approach
    Zhong, GQ
    Amamiya, S
    Takahashi, K
    Amamiya, M
    EMBEDDED SOFTWARE AND SYSTEMS, 2005, 3605 : 94 - 102
  • [8] Agent-based collaborative negotiation for manufacturing supply chain coordination
    Jiao, JXR
    You, X
    Kumar, A
    2004 IEEE CONFERENCE ON CYBERNETICS AND INTELLIGENT SYSTEMS, VOLS 1 AND 2, 2004, : 41 - 46
  • [9] An agent-based evolutionary strategic negotiation for project dynamic scheduling
    Chen, Yee-Ming
    Wang, Shih-Chang
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2007, 35 (3-4): : 333 - 348
  • [10] An agent-based evolutionary strategic negotiation for project dynamic scheduling
    Yee-Ming Chen
    Shih-Chang Wang
    The International Journal of Advanced Manufacturing Technology, 2007, 35 : 333 - 348