Assessment of preventive maintenance interval for vehicles

被引:0
|
作者
Furch, I. J. [1 ]
机构
[1] Univ Def, Fac Mil Technol, Brno, Czech Republic
关键词
interval service maintenance vehicles; Weibull progression; Nelson method;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The paper deals with the problem of determination of the optimal vehicle service maintenance interval of operation. The Weibull progression is the possible method for determination of the optimal interval of the vehicle service maintenance. The Nelson method was used for the determination of parameters of the Weibull progression and specification of confidence intervals. The initial programme of the vehicle maintenance is often developed in cooperation with a supplier and a user. However, the initial maintenance programme does not have to be optimal. That is why it is desirable to initialize data collection about real process of defect degradation and incidence immediately after the operation start. If these data are available, their analysis can be carried out and on the basis of the analysis the contents of the initial maintenance programme can be changed to better meet the requirements of the user.
引用
收藏
页码:56 / 59
页数:4
相关论文
共 50 条
  • [21] A joint optimization model for production scheduling and preventive maintenance interval
    Babaeimorad S.
    Fattahi P.
    Fazlollahtabar H.
    International Journal of Engineering, Transactions B: Applications, 2021, 34 (11): : 2508 - 2516
  • [22] Planning preventive maintenance for a fleet of police vehicles using simulation
    Joo, SJ
    Levary, RR
    Ferris, ME
    SIMULATION, 1997, 68 (02) : 93 - 100
  • [23] Preventive maintenance for heterogeneous industrial vehicles with incomplete usage data
    Markudova, Dena
    Mishra, Sachit
    Cagliero, Luca
    Vassio, Luca
    Mellia, Marco
    Baralis, Elena
    Salvatori, Lucia
    Loti, Riccardo
    COMPUTERS IN INDUSTRY, 2021, 130
  • [24] On determination of the preventive maintenance interval guaranteeing system availability under a periodic maintenance policy
    Ahn, Suneung
    Kim, Woohyun
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2011, 7 (04) : 307 - 314
  • [25] Preventive maintenance scheduling of multi-component systems with interval costs
    Gustavsson, Emil
    Patriksson, Michael
    Stromberg, Ann-Brith
    Wojciechowski, Adam
    Onnheim, Magnus
    COMPUTERS & INDUSTRIAL ENGINEERING, 2014, 76 : 390 - 400
  • [26] OPTIMAL QUASI-PERIODIC PREVENTIVE MAINTENANCE POLICIES FOR A REPAIRABLE SYSTEM WITH STOCHASTIC MAINTENANCE INTERVAL
    Gao, Wenke
    Zhang, Zhisheng
    Ji, Hong
    Zhou, Yifan
    Liu, Qi
    EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2015, 17 (03): : 389 - 397
  • [27] Bayesian analysis of fixed-interval preventive-maintenance models
    IMA J Math Appl Bus Ind, 2 (157-175):
  • [28] A method for obtaining the preventive maintenance interval in the absence of failure time data
    Sanchez-Herguedas, Antonio
    Mena-Nieto, Angel
    Rodrigo-Munoz, Francisco
    EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2022, 24 (03): : 564 - 573
  • [29] Integrating flexible-interval preventive maintenance planning with production scheduling
    Jin, Yu-Lan
    Jiang, Zu-Hua
    Hou, Wen-Rui
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2009, 22 (12) : 1089 - 1101
  • [30] THE USE OF MILITARY VEHICLES WITH FOCUS ON PREVENTIVE MAINTENANCE IN FRAME OF LIFE CYCLE
    Jaromir, Mares
    15TH INTERNATIONAL CONFERENCE THE KNOWLEDGE-BASED ORGANIZATION: APPLIED TECHNICAL SCIENCES AND ADVANCED MILITARY TECHNOLOGIES, CONFERENCE PROCEEDINGS 6, 2009, 6 : 70 - 75