Addition of railroad to the Tagus river suspension bridge

被引:0
|
作者
Crawford, CE
Moniz, LD
机构
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Tagus River Suspension Bridge in Lisbon, Portugal was opened to four lanes of traffic in 1966, and is now being reconstructed to carry six traffic lanes plus two railroad tracks. The original design for the bridge included a future provision for railroad through the addition of cable stays. During preliminary design for the present strengthening, it was found that a more efficient solution is a system of supplementary externally anchored suspension cables which will be placed above the existing main cables. The trains will run on a new orthotropic floor system located at the bottom chord of the stiffening truss. Construction started in early 1996 and is expected to be completed in 1998. The design included wind tunnel testing, a detailed two-tier seismic analysis, and a time-history analysis of train vibration effects on vehicular passengers.
引用
收藏
页码:117 / 124
页数:8
相关论文
共 50 条
  • [41] The third bridge across the Orinoco River/Venezuela - A double-deck bridge cable-stayed bridge for highway and railroad with composite truss girder
    Saul, Reiner
    Humpf, Karl
    Schiele, Ingo
    STAHLBAU, 2010, 79 (02) : 63 - 76
  • [42] Aerodynamic Characterization of the 516 Arouca Pedestrian Suspension Bridge over the Paiva River
    da Silva, Fernando Marques
    WIND, 2023, 3 (01): : 79 - 96
  • [43] Project of the New Alcantara Arch Bridge Over Tagus River on the EX-117 Road. (Cáceres)
    de Leon, Ramon Sanchez
    Gomez, Alberto Herrera
    de Leon, Francisco Sanchez
    HORMIGON Y ACERO, 2024, 75 (304): : 7 - 14
  • [44] Optimization of River Sampling: Application to Nutrients Distribution in Tagus River Estuary
    Borges, Carlos
    Palma, Carla
    da Silva, Ricardo Bettencourt
    ANALYTICAL CHEMISTRY, 2019, 91 (09) : 5698 - 5705
  • [45] Subtidal variability of the Tagus river plume in winter 2013
    Vaz, Nuno
    Rodrigues, Joao G.
    Mateus, Marcos
    Franz, Guilherme
    Campuzano, Francisco
    Neves, Ramiro
    Dias, Joao Miguel
    SCIENCE OF THE TOTAL ENVIRONMENT, 2018, 627 : 1353 - 1362
  • [46] Ronda: new news about the first and old bridge of Tagus
    Cadinanos Bardeci, Inocencio
    BOLETIN DE ARTE-UMA, 2014, (35): : 271 - 280
  • [47] STUDY OF AGGRESSIVENESS OF WATERS OF RIVER TAGUS IN LISBON HARBOUR
    FLORENCI.CE
    DACRUZ, MML
    REVISTA PORTUGESA DE QUIMICA, 1969, 11 (1-4): : 105 - &
  • [48] Integrated pollution evaluation of the Tagus River in Central Spain
    Berzas Nevado, J. J.
    Rodriguez Martin-Doimeadios, R. C.
    Guzman Bernardo, F. J.
    Jimenez Moreno, M.
    Ortega Tardio, S.
    Sanchez-Herrera Fornieles, M. M.
    Martin-Nieto Rios, S.
    Doncel Perez, A.
    ENVIRONMENTAL MONITORING AND ASSESSMENT, 2009, 156 (1-4) : 461 - 477
  • [49] Vibration Analysis of Thermoplastic Railroad Bridge
    Shbeeb, Nadim I.
    Al-Rousan, Rajai Z.
    JORDAN JOURNAL OF CIVIL ENGINEERING, 2018, 12 (01) : 70 - 77
  • [50] Railroad bascule bridge load rating
    Yang, Y. Z.
    Magistro, D. A.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE EXTENSION, 2014, : 1337 - 1344