NATM tunnels at Stanford Linear Accelerator Center, Menlo Park, California

被引:0
|
作者
Doig, P. J. [1 ]
机构
[1] Hatch Mott MacDonald, Sacramento, CA USA
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The LCLS project at SLAC will allow new insights into material properties, chemical reactions and biological processes. The project includes half a mile of new underground construction. Excavation in weathered rock is by NATM, using AM 50 roadheaders. Construction began in 2006 and is expected to be completed in 2008. This paper details the construction of the tunnels and cavern on the project.
引用
收藏
页码:264 / 270
页数:7
相关论文
共 50 条