An integrated fuzzy approach for information technology planning in collaborative product development

被引:13
|
作者
Arsenyan, Jbid [1 ]
Buyukozkan, Gulcin [2 ]
机构
[1] Bahcesehir Univ, Ind Engn, Istanbul, Turkey
[2] Galatasaray Univ, Ind Engn, Istanbul, Turkey
关键词
collaborative product development; information technology; planning; fuzzy modelling; House of Quality; axiomatic design; fuzzy rule-based systems; QUALITY FUNCTION DEPLOYMENT; KNOWLEDGE MANAGEMENT; QFD; SYSTEM; METHODOLOGY; FRAMEWORK; PERFORMANCE; SELECTION; SUPPORT; MODEL;
D O I
10.1080/00207543.2015.1043032
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Collaborative product development (CPD) processes are generally based on technological infrastructures. Various information technologies (IT) are proposed every day to facilitate collaboration, integration, co-design and co-development processes. In this highly uncertain environment, a systematic methodology is essential to plan the IT infrastructure needed to start and maintain a collaborative process. This study offers an integrated IT planning methodology combining fuzzy quality function deployment, fuzzy axiomatic design and fuzzy rule-based systems. The methodology is tested in a CPD case and the outcome presents an improvement path for IT for each of the collaborative parties.
引用
收藏
页码:3149 / 3169
页数:21
相关论文
共 50 条
  • [41] Knowledge representation for product and processes development planning in collaborative environments
    Solano, Lorenzo
    Rosado, Pedro
    Romero, Fernando
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2014, 27 (08) : 787 - 801
  • [42] An integrated fuzzy QFD framework for new product development
    Lee, Amy H. I.
    Lin, Chun-Yu
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2011, 23 (01) : 26 - 47
  • [43] An integrated fuzzy QFD framework for new product development
    Amy H. I. Lee
    Chun-Yu Lin
    Flexible Services and Manufacturing Journal, 2011, 23 : 26 - 47
  • [44] FACTORS AFFECTING THE PROCESS OF COLLABORATIVE PRODUCT DEVELOPMENT - A STUDY OF UK MANUFACTURERS OF INFORMATION AND COMMUNICATIONS TECHNOLOGY PRODUCTS
    LITTLER, D
    LEVERICK, F
    BRUCE, M
    JOURNAL OF PRODUCT INNOVATION MANAGEMENT, 1995, 12 (01) : 16 - 32
  • [45] A fuzzy-AHP approach to prioritization of CS attributes in target planning for automotive product development
    Nepal, Bimal
    Yadav, Om P.
    Murat, Alper
    EXPERT SYSTEMS WITH APPLICATIONS, 2010, 37 (10) : 6775 - 6786
  • [46] INTEGRATED PRODUCT AND PROCESS DEVELOPMENT IN COLLABORATIVE VIRTUAL ENGINEERING ENVIRONMENT
    Mandic, Vesna
    Cosic, Predrag
    TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2011, 18 (03): : 369 - 378
  • [47] Integrated service mechanism of networked collaborative product development resources
    Yin, Sheng
    Yin, Chao
    Liu, Fei
    Guo, Kun-Yi
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2009, 15 (11): : 2233 - 2240
  • [48] Collaborative Product Development Experience in a Senior Integrated Manufacturing Course
    Vila, Carlos
    Abellan-Nebot, Jose V.
    Estruch, Antonio M.
    Siller, Hector R.
    INTERNATIONAL JOURNAL OF ENGINEERING EDUCATION, 2009, 25 (05) : 886 - 899
  • [49] Virtual collaborative simulation environment for integrated product and process development
    Harrison, JP
    Christensen, B
    Gulli, M
    Bianco, J
    PROCEEDINGS OF THE FIFTH IEEE INTERNATIONAL SYMPOSIUM ON HIGH PERFORMANCE DISTRIBUTED COMPUTING, 1996, : 19 - 22
  • [50] Integrated product and process development in collaborative virtual engineering environment
    Mandić, Vesna
    Ćosić, Predrag
    Tehnicki Vjesnik, 2011, 18 (03): : 369 - 378