Physical modeling of joints spacing effects on penetration rate of rotary drilling in open pit mines

被引:0
|
作者
Hoseinie, H. S. [1 ]
Pourrahimian, Y. [2 ]
Aghababaei, H. [2 ]
机构
[1] Shahrood Univ Tech, Fac Mining Engn & Geophys, Shahrood, Iran
[2] Sahand Univ Tech, Fac Min Engn, Tabriz, Iran
来源
PROCEEDINGS OF THE 20TH INTERNATIONAL MINING CONGRESS AND EXHIBITION OF TURKEY, NO 133 | 2007年
关键词
D O I
暂无
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
Drilling is one of the most expensive stages of open pit mining and has many complexities. In drilling process, many parameters interact simultaneously each other, where studying each parameter requires recognition of the effects of other characteristics of rock mass and its material. In this paper, the main aim has been directed to investigate the effects of joint spacing among the structural parameters of rock mass. For this purpose, in order to study the condition of drilling in jointed rocks with different spacings, jointed rock masses with spacing of 10, 20, 30, 50 and 100 centimeters physically were modeled in laboratory by using cemented blocks. Penetration rate of cross bit has been measured by using rotary drilling system. According to the numerical results obtained from experiments, by increasing of joints spacing, penetration rate (m/min) of drill bit in jointed rock masses increases logarithmically.
引用
收藏
页码:259 / +
页数:3
相关论文
共 50 条
  • [31] Modeling temperature field dynamics in post-blasting open pit mines in permafrost
    M. V. Kaimonov
    S. V. Panishev
    Journal of Mining Science, 2016, 52 : 601 - 607
  • [32] Stochastic Modeling Approach for the Evaluation of Backbreak due to Blasting Operations in Open Pit Mines
    Sari, Mehmet
    Ghasemi, Ebrahim
    Ataei, Mohammad
    ROCK MECHANICS AND ROCK ENGINEERING, 2014, 47 (02) : 771 - 783
  • [33] Stochastic Modeling Approach for the Evaluation of Backbreak due to Blasting Operations in Open Pit Mines
    Mehmet Sari
    Ebrahim Ghasemi
    Mohammad Ataei
    Rock Mechanics and Rock Engineering, 2014, 47 : 771 - 783
  • [34] COMBINED PERCUSSIVE-ROTARY DRILLING TO INCREASE RATE OF PENETRATION AND LIFE OF DRILL BIT IN DRILLING HARD ROCK FORMATION
    Zha, Chunqing
    Liu, Gonghui
    Li, Jun
    Li, Yumei
    Xi, Yan
    Guo, Boyun
    CHEMISTRY AND TECHNOLOGY OF FUELS AND OILS, 2017, 53 (02) : 254 - 262
  • [35] Combined Percussive-Rotary Drilling to Increase Rate of Penetration and Life of Drill Bit in Drilling Hard Rock Formation
    Chunqing Zha
    Gonghui Liu
    Jun Li
    Yumei Li
    Yan Xi
    Boyun Guo
    Chemistry and Technology of Fuels and Oils, 2017, 53 : 254 - 262
  • [36] The effects of open pit blastholes Physical parameters on overbreak
    Osanloo, M
    Samareh, H
    MINE PLANNING AND EQUIPMENT SELECTION 2001, 2001, : 439 - 443
  • [37] Prediction of rotary drilling penetration rate in iron ore oxides using rock engineering system
    Hossein Inanloo Arabi Shad
    Farhang Sereshki
    Mohammad Ataei
    Mohammad Karamoozian
    InternationalJournalofMiningScienceandTechnology, 2018, 28 (03) : 407 - 413
  • [38] Prediction of rotary drilling penetration rate in iron ore oxides using rock engineering system
    Shad, Hossein Inanloo Arabi
    Sereshki, Farhang
    Ataei, Mohammad
    Karamoozian, Mohammad
    INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2018, 28 (03) : 407 - 413
  • [39] Advantages and disadvantages of down-the-hole hammer blasthole drilling vs rotary drilling in large scale open pit surface mining
    Raitt, GD
    Lyon, R
    TWENTY-FOURTH ANNUAL CONFERENCE ON EXPLOSIVES AND BLASTING TECHNIQUE, 1998, : 365 - 375
  • [40] Deploying Oil & Gas drilling techniques with Dewatering Well Placement technology (DWPt) in open pit and underground mines
    Boland, Martin
    Rowland, Angus
    Bester, Marnus
    Cintolesi, Christian
    Dowling, Jeremy
    MINING MEETS WATER - CONFLICTS AND SOLUTIONS, 2016, : 455 - 462