Allocation Model of Macro Economy Risk Associated With PPP Projects

被引:0
|
作者
Xu YeLin [1 ]
Cheng Hu [1 ]
机构
[1] Southeast Univ, Dept Bldg & Real Estate, Nanjing 210009, Jiangsu, Peoples R China
关键词
Risk allocation; Macro economy risk; China;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A common objective in PPPs is the transfer of project risks to the party who is best able to control and mange the risk. However, in practice, the allocation pattern for macro economy risk is difficult to be determined, as neither the government nor the private sector is capable to control. This paper aims to explore the rationale behind those decisions about the distribution of macro economy risk. Meanwhile, demonstrates the complexity and the difficulties in distributing them appropriately. The findings should provide a better understanding of the risk allocation on macro economy risk between the public and private sectors; hence a more efficient risk allocation framework for PPP development in China can be established. The purpose of this paper is to explore the rationale behind decisions about the distribution of macro economy risk between the public and private sectors and demonstrates the complexity and the difficulties in distributing them appropriately.
引用
收藏
页码:2492 / 2496
页数:5
相关论文
共 50 条
  • [21] A Fuzzy Comprehensive Evaluation Model for Sustainability Risk Evaluation of PPP Projects
    Bai, Libiao
    Li, Yi
    Du, Qiang
    Xu, Yadan
    SUSTAINABILITY, 2017, 9 (10)
  • [22] Early warning of risk for transportation infrastructure projects under a PPP model
    Research Institute of Construction Management and Real Estate, Southeast University, Nanjing 210096, China
    不详
    Chongqing Jianzhu Daxue Xuebao, 2008, 5 (90-94): : 90 - 94
  • [23] Risk allocation and benefit distribution of PPP projects for construction waste recycling: a case study of China
    Wang, Zhenshuang
    Zhou, Yanxin
    Jin, Xiaohua
    Zhao, Ning
    Sun, Jianshu
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (09) : 3927 - 3956
  • [24] Critical factors and risk allocation for PPP policy: Comparison between HSR and general infrastructure projects
    Chou, Jui-Sheng
    Tserng, H. Ping
    Lin, Chieh
    Yeh, Chun-Pin
    TRANSPORT POLICY, 2012, 22 : 36 - 48
  • [25] Risk Identification and Analysis in PPP Projects
    Deng Xiaopeng
    Huang Zhi-ye
    Zheng Yan-lu
    Yuan Jingfeng
    CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 2624 - 2635
  • [26] Selection model of concessionaire in PPP projects
    Wu, Qian
    Gao, Yanan
    ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 2906 - 2910
  • [27] Studies on Risk Management of the Urban Infrastructure Projects Based on the PPP Financing Model
    Chen, Hanli
    Ma, ChaoQun
    Liu, Bo
    Qin, Tao
    2009 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS ( ICAL 2009), VOLS 1-3, 2009, : 1614 - +
  • [28] Risk Assessment of Water Environment Treatment PPP Projects Based on a Cloud Model
    Zhang, Yaqiong
    He, Nan
    Li, Yijing
    Chen, Yiyang
    Wang, Lei
    Ran, Yunlong
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2021, 2021
  • [29] Bargaining optimization model for risk renegotiation with fairness concerns in infrastructure PPP projects
    Chen, Canjun
    Lv, Lelin
    Wang, Zhuofu
    Qiao, Ran
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (09) : 3876 - 3894
  • [30] PPP-risk identification and allocation model: The crucial success factor for PPPs
    Pohle, T.
    Girmscheid, G.
    CHALLENGES, OPPORTUNITIES AND SOLUTIONS IN STRUCTURAL ENGINEERING AND CONSTRUCTION, 2010, : 745 - 750