A Fuzzy-Based Evaluation of Financial Risks in Build-Own-Operate-Transfer Water Supply Projects

被引:18
|
作者
Ameyaw, Ernest E. [1 ,2 ]
Chan, Albert P. C. [3 ]
Owusu-Manu, De-Graft [4 ]
Edwards, David J. [5 ]
Dartey, Frederick [6 ]
机构
[1] Coventry Univ, Sch Energy Construct & Environm, Priory St, Coventry CV1 5FB, W Midlands, England
[2] Coventry Univ, Ctr Low Impact Bldg, Sch Energy Construct & Environm, Priory St, Coventry CV1 5FB, W Midlands, England
[3] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hong Kong, Hong Kong, Peoples R China
[4] Kwame Nkrumah Univ Sci & Technol, Dept Bldg Technol, Kumasi, Ghana
[5] Birmingham City Univ, Fac Technol Environm & Engn, Birmingham B4 7BD, W Midlands, England
[6] Minist Finance, PPP Advisory Unit, Accra, Ghana
关键词
Build-own-operate-transfer (BOOT); Fuzzy synthetic evaluation; Water supply; Financial risk; SYNTHETIC EVALUATION; DECISION-MAKING; PERFORMANCE INDEX; BOT; SELECTION; SYSTEM; MODEL;
D O I
10.1061/(ASCE)IS.1943-555X.0000390
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The build-own-operate-transfer (BOOT) scheme is widely used for the provision of new bulk water supply. However, this scheme is complex and carries significant financial risks because of the characteristics of the water sector and the involvement of public-private stakeholders with new and extended responsibilities, large private capital, and long contract duration. Drawing on the Nungua Seawater Desalination Plant (NSDP) in Ghana, this study seeks to identify and assess the critical financial risks associated with BOOT water supply projects and evaluate the financial risk level of the NSDP project. The risks and their relative criticality on the NSDP project are investigated by using a questionnaire survey method. The questionnaire was formulated with a set of 18 risks derived from extant literature and project documentation. Perceived critical financial risks affecting the NSDP project were assessed by a team of experts who had direct involvement in the project. A fuzzy synthetic evaluation suggests that the project is financially risky and that all the risks are critical to the project. Bankruptcy of consortium members, unfavorable economy of the host country, uncertainty in tariff adjustment of water products, rate of return restrictions, and availability problem of private capital are the five most highly-ranked risks. The fuzzy technique is used to represent and model experiential knowledge of the survey participants and to address the fuzziness of their expert judgments. The study's results facilitate prioritization of risks and a comprehensive risk management program during the lifecycle of the case project and future projects. The fuzzy technique is suitable for early phases of BOOT projects to prioritize the risks that require a detailed analysis and to predict the risk level of a project. (c) 2017 American Society of Civil Engineers.
引用
收藏
页数:13
相关论文
共 43 条
  • [22] Communicating human health risks associated with disinfection by-products in drinking water supplies: a fuzzy-based approach
    Rehan Sadiq
    Manuel J. Rodriguez
    Syed A. Imran
    Homayoun Najjaran
    Stochastic Environmental Research and Risk Assessment, 2007, 21 : 341 - 353
  • [23] Communicating human health risks associated with disinfection by-products in drinking water supplies: a fuzzy-based approach
    Sadiq, Rehan
    Rodriguez, Manuel J.
    Imran, Syed A.
    Najjaran, Homayoun
    STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2007, 21 (04) : 341 - 353
  • [24] Fuzzy Logic Analysis of the Build, Capacity Build and Transfer (B-CB-T) Modality for Urban Water Supply Service Delivery in Ethiopia
    Godfrey, Samuel
    Asmare, Getachew
    Gossa, Tamene
    Paba, Michele
    WATER, 2019, 11 (05)
  • [25] Analyzing sustainability risks associated with blockchain technology implementation in the sustainable supply chain of construction industry: a fuzzy-based MCDM approach
    Gu, Zhenjing
    Irfan, Muhammad
    Singh, Atul Kumar
    Ramaraju, H. K.
    Mohandes, Saeed Reza
    Guan, Yunpeng
    ANNALS OF OPERATIONS RESEARCH, 2025,
  • [26] A Fuzzy AHP-Based Comprehensive Evaluation of Cost-Overrun Risks in Construction Projects in China
    Wang Jiayuan
    Zou, Patrick X. W.
    Ma Shichao
    CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 1472 - 1486
  • [27] Indicators and a Neuro-Fuzzy Based Model for the Evaluation of Water Supply Sustainability
    Ivan Halkijevic
    Zivko Vukovic
    Drazen Vouk
    Water Resources Management, 2017, 31 : 3683 - 3698
  • [28] Indicators and a Neuro-Fuzzy Based Model for the Evaluation of Water Supply Sustainability
    Halkijevic, Ivan
    Vukovic, Zivko
    Vouk, Drazen
    WATER RESOURCES MANAGEMENT, 2017, 31 (12) : 3683 - 3698
  • [29] Fuzzy Hierarchy Synthesis Evaluation of Water Supply & Drainage Talents Based on CDIO
    He, Fang
    Zhu, Lei
    Chen, Wei
    3RD INTERNATIONAL CONFERENCE ON APPLIED ENGINEERING, 2016, 51 : 649 - 654
  • [30] Evaluation and selection of projects using hybrid MCDM technique under fuzzy environment based on financial factors
    Vijayakumar, S. R.
    Suresh, P.
    Sasikumar, K.
    Pasupathi, K.
    Yuvaraj, T.
    Velmurugan, D.
    MATERIALS TODAY-PROCEEDINGS, 2022, 60 : 1347 - 1352