A Fuzzy-Based Evaluation of Financial Risks in Build-Own-Operate-Transfer Water Supply Projects

被引:18
|
作者
Ameyaw, Ernest E. [1 ,2 ]
Chan, Albert P. C. [3 ]
Owusu-Manu, De-Graft [4 ]
Edwards, David J. [5 ]
Dartey, Frederick [6 ]
机构
[1] Coventry Univ, Sch Energy Construct & Environm, Priory St, Coventry CV1 5FB, W Midlands, England
[2] Coventry Univ, Ctr Low Impact Bldg, Sch Energy Construct & Environm, Priory St, Coventry CV1 5FB, W Midlands, England
[3] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hong Kong, Hong Kong, Peoples R China
[4] Kwame Nkrumah Univ Sci & Technol, Dept Bldg Technol, Kumasi, Ghana
[5] Birmingham City Univ, Fac Technol Environm & Engn, Birmingham B4 7BD, W Midlands, England
[6] Minist Finance, PPP Advisory Unit, Accra, Ghana
关键词
Build-own-operate-transfer (BOOT); Fuzzy synthetic evaluation; Water supply; Financial risk; SYNTHETIC EVALUATION; DECISION-MAKING; PERFORMANCE INDEX; BOT; SELECTION; SYSTEM; MODEL;
D O I
10.1061/(ASCE)IS.1943-555X.0000390
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The build-own-operate-transfer (BOOT) scheme is widely used for the provision of new bulk water supply. However, this scheme is complex and carries significant financial risks because of the characteristics of the water sector and the involvement of public-private stakeholders with new and extended responsibilities, large private capital, and long contract duration. Drawing on the Nungua Seawater Desalination Plant (NSDP) in Ghana, this study seeks to identify and assess the critical financial risks associated with BOOT water supply projects and evaluate the financial risk level of the NSDP project. The risks and their relative criticality on the NSDP project are investigated by using a questionnaire survey method. The questionnaire was formulated with a set of 18 risks derived from extant literature and project documentation. Perceived critical financial risks affecting the NSDP project were assessed by a team of experts who had direct involvement in the project. A fuzzy synthetic evaluation suggests that the project is financially risky and that all the risks are critical to the project. Bankruptcy of consortium members, unfavorable economy of the host country, uncertainty in tariff adjustment of water products, rate of return restrictions, and availability problem of private capital are the five most highly-ranked risks. The fuzzy technique is used to represent and model experiential knowledge of the survey participants and to address the fuzziness of their expert judgments. The study's results facilitate prioritization of risks and a comprehensive risk management program during the lifecycle of the case project and future projects. The fuzzy technique is suitable for early phases of BOOT projects to prioritize the risks that require a detailed analysis and to predict the risk level of a project. (c) 2017 American Society of Civil Engineers.
引用
收藏
页数:13
相关论文
共 43 条
  • [1] The financial risks in build-operate-transfer projects
    Xenidis, Yiannis
    Angelides, Demos
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2005, 23 (04) : 431 - 441
  • [2] Management of Foreign Exchange Risk for Build-Own-Operate-Transfer Hydropower Projects in Nepal: A Good-for-All Approach
    Kuikel, Badri
    Maemura, Yu
    Ozawa, Kazumasa
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2023, 29 (02)
  • [3] Risks and mitigation measures in build-operate-transfer projects
    Bokharey, Syed Kamarul Bakri Syed Ahmad
    Vallyutham, Kalaikumar
    Potty, Narayanan Sambu
    Bakar, Nabilah Abu
    World Academy of Science, Engineering and Technology, 2010, 4 (03): : 81 - 87
  • [4] Financial Evaluation of Build-Operate-Transfer Projects: A Case Study of Myanmar Ports
    Lin, Khin
    Yang Hua-long
    Banomyong, Ruth
    2011 INTERNATIONAL CONFERENCE ON ECONOMIC, EDUCATION AND MANAGEMENT (ICEEM2011), VOL I, 2011, : 254 - 257
  • [6] Determination of Concession Period in Build-Operate Transfer Projects Using Fuzzy Logic
    Nasirzadeh, Farnad
    Khanzadi, Mostafa
    Alipour, Majid
    IRANIAN JOURNAL OF MANAGEMENT STUDIES, 2014, 7 (02) : 437 - 456
  • [7] Allocation of risks under build-operate-transfer delivery approach for transport infrastructure projects
    Abdul-Malak, MAU
    Kaysi, IA
    Schoucair, MS
    CONSTRUCTION 2001: MATERIALS AND CONSTRUCTION, 2001, (1761): : 137 - 147
  • [8] Allocation of risks under build-operate-transfer delivery approach for transport infrastructure projects
    Abdul-Malak, Mohamed-Asem U.
    Kaysi, Isam A.
    Schoucair, Marwan S.
    Transportation Research Record, 2001, (1761) : 137 - 147
  • [9] CONCESSION MODEL FOR FAIR DISTRIBUTION OF BENEFITS AND RISKS IN BUILD-OPERATE-TRANSFER ROAD PROJECTS
    Yan, Xue
    Chong, Heap-Yih
    Zhou, Jing
    Li, Qian
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2019, 25 (03) : 265 - 275
  • [10] Concessionaire's financial capability in developing build-operate-transfer type infrastructure projects
    Zhang, XQ
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2005, 131 (10): : 1054 - 1064