Prefabricated Prefinished Volumetric Construction: Key Constraints and Mitigation Strategies

被引:6
|
作者
Liu, W. Q. [1 ]
Hwang, B. G. [2 ]
Shan, M. [1 ]
Looi, K. Y. [3 ]
机构
[1] Cent South Univ, Sch Civil Engn, 22 South Shaoshan Rd, Changsha 410075, Peoples R China
[2] Natl Univ Singapore, Dept Bldg, 4 Architecture Dr, Singapore 117566, Singapore
[3] Arcadis Singapore Pte Ltd, 1 Magazine Rd,05-01 Cent Mall, Singapore 059567, Singapore
关键词
D O I
10.1088/1755-1315/385/1/012001
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Prefabricated prefinished buildings (PPVC) is a more innovative and cleaner way to reorganize production in the construction industry. Although the application of PPVC has been well received over the past few decades, the limitations of using PPVC have not been explored. Therefore, the purpose of this study is to investigate the main factors influencing the adoption of PPVC and propose a set of feasible mitigation strategies to address these factors. To achieve these goals, a comprehensive literature review was conducted first, followed by a structured questionnaire survey of 41 Singapore construction organizations. The analysis showed that the top five major limiting factors and found the top three most effective mitigation strategies. This study contributes to the knowledge system by studying the constraints and mitigation strategies of PPVC. At the same time, the results of this study also have some implications for the industry to understand and implement PPVC better.
引用
收藏
页数:7
相关论文
共 50 条
  • [31] A Review on Construction Safety: Hazards, Mitigation Strategies, and Impacted Sectors
    Almaskati, Deema
    Kermanshachi, Sharareh
    Pamidimukkala, Apurva
    Loganathan, Karthikeyan
    Yin, Zhe
    BUILDINGS, 2024, 14 (02)
  • [32] Mitigation of ruminant methane production: current strategies, constraints and future options
    Muhammad Farooq Iqbal
    Yan-Fen Cheng
    Wei-Yun Zhu
    Basit Zeshan
    World Journal of Microbiology and Biotechnology, 2008, 24 : 2747 - 2755
  • [33] Mitigation of ruminant methane production: current strategies, constraints and future options
    Iqbal, Muhammad Farooq
    Cheng, Yan-Fen
    Zhu, Wei-Yun
    Zeshan, Basit
    WORLD JOURNAL OF MICROBIOLOGY & BIOTECHNOLOGY, 2008, 24 (12): : 2747 - 2755
  • [34] Modelling of pricing, crashing, and coordination strategies of prefabricated construction supply Chain with power structure
    Jiang, Wen
    Shi, Kanfeng
    Zhang, Lin
    Jiang, Weiling
    PLOS ONE, 2023, 18 (08):
  • [35] Influencing Factors and Promotion Strategies for the Adoption or Resistance of Prefabricated Buildings by Construction Companies in Botswana
    Morake, Otsile
    Meng, Qingfeng
    Sampene, Agyemang Kwasi
    Kyere, Francis
    BUILDINGS, 2024, 14 (11)
  • [36] Analysis of carbon emissions reduction strategies for prefabricated buildings under cost constraints: a case study
    Jiang, Xiaoyan
    Bai, Xuemei
    Zhang, Yubin
    Lyu, Sainan
    Xu, Erman
    Skitmore, Martin
    ARCHITECTURAL ENGINEERING AND DESIGN MANAGEMENT, 2025,
  • [37] Evolutionary Game Simulation on Government Incentive Strategies of Prefabricated Construction: A System Dynamics Approach
    Cheng, Baoquan
    Wei, Yuhu
    Zhang, Wei
    Zhou, Xintao
    Chen, Huihua
    Huang, Lipeng
    Huang, Jianling
    Kang, Xiaofang
    COMPLEXITY, 2020, 2020 (2020)
  • [38] Urban form and air pollution disperse: Key indexes and mitigation strategies
    Yang, Junyan
    Shi, Beixiang
    Zheng, Yi
    Shi, Yi
    Xia, Geyang
    SUSTAINABLE CITIES AND SOCIETY, 2020, 57 (57)
  • [39] Flexible and Sustainable Incremental Houses: Advancing Semi-Volumetric Systems of Prefabricated Construction for Rapid Urbanization in Indonesia
    Viriezky, Viata
    Susanto, Dalhar
    Alkadri, Miktha Farid
    INFRASTRUCTURES, 2025, 10 (01)
  • [40] Assessing compliance of infection prevention mitigation strategies in hospital construction and renovation
    Buchanan, Mark O.
    Sickbert-Bennett, Emily E.
    DiBiase, Lauren M.
    Weber, David J.
    INFECTION CONTROL & HOSPITAL EPIDEMIOLOGY, 2023, 44 (02) : 342 - 344