Prefabricated Prefinished Volumetric Construction: Key Constraints and Mitigation Strategies

被引:6
|
作者
Liu, W. Q. [1 ]
Hwang, B. G. [2 ]
Shan, M. [1 ]
Looi, K. Y. [3 ]
机构
[1] Cent South Univ, Sch Civil Engn, 22 South Shaoshan Rd, Changsha 410075, Peoples R China
[2] Natl Univ Singapore, Dept Bldg, 4 Architecture Dr, Singapore 117566, Singapore
[3] Arcadis Singapore Pte Ltd, 1 Magazine Rd,05-01 Cent Mall, Singapore 059567, Singapore
关键词
D O I
10.1088/1755-1315/385/1/012001
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Prefabricated prefinished buildings (PPVC) is a more innovative and cleaner way to reorganize production in the construction industry. Although the application of PPVC has been well received over the past few decades, the limitations of using PPVC have not been explored. Therefore, the purpose of this study is to investigate the main factors influencing the adoption of PPVC and propose a set of feasible mitigation strategies to address these factors. To achieve these goals, a comprehensive literature review was conducted first, followed by a structured questionnaire survey of 41 Singapore construction organizations. The analysis showed that the top five major limiting factors and found the top three most effective mitigation strategies. This study contributes to the knowledge system by studying the constraints and mitigation strategies of PPVC. At the same time, the results of this study also have some implications for the industry to understand and implement PPVC better.
引用
收藏
页数:7
相关论文
共 50 条
  • [1] Key constraints and mitigation strategies for prefabricated prefinished volumetric construction
    Hwang, Bon-Gang
    Shan, Ming
    Looi, Kit-Ying
    JOURNAL OF CLEANER PRODUCTION, 2018, 183 : 183 - 193
  • [2] Stakeholder management in prefabricated prefinished volumetric construction projects: benchmarking the key result areas
    Wuni, Ibrahim Yahaya
    Shen, Geoffrey Qiping
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2020, 10 (03) : 407 - 421
  • [3] Development of an innovative FlexLock Connector for prefabricated prefinished volumetric construction
    Lian, Jun-Yi
    Zhang, Wen-Yuan
    Ding, Yu-Kun
    STRUCTURES, 2024, 68
  • [4] Evaluating the critical success criteria for prefabricated prefinished volumetric construction projects
    Wuni, Ibrahim Yahaya
    Shen, Geoffrey Qiping
    Osei-Kyei, Robert
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2021, 26 (02) : 279 - 297
  • [5] Seismic performance of connection joints between prefabricated prefinished volumetric construction
    Yan Q.-F.
    Zhang J.-G.
    Wang T.
    Chen D.-G.
    Yu Y.-S.
    Yang Y.-C.
    Jilin Daxue Xuebao (Gongxueban)/Journal of Jilin University (Engineering and Technology Edition), 2023, 53 (02): : 505 - 514
  • [6] The Intelligent use of RFID and BIM in Prefabricated, Prefinished, Volumetric Construction Work Flow
    Abbott, Ernest L. S.
    Chua, David K. H.
    9TH INTERNATIONAL CONFERENCE ON ENGINEERING, PROJECT, AND PRODUCTION MANAGEMENT (EPPM2018), 2020, 312
  • [7] Knowledge-based decision support system for prefabricated prefinished volumetric construction
    Hwang, Bon-Gang
    Shan, Ming
    Looi, Kit-Ying
    AUTOMATION IN CONSTRUCTION, 2018, 94 : 168 - 178
  • [8] Robustness of Prefabricated Prefinished Volumetric Construction (PPVC) High-rise Building
    Chua, Y. S.
    Liew, J. Y. R.
    Pang, S. D.
    PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE ON ADVANCES IN STEEL-CONCRETE COMPOSITE STRUCTURES (ASCCS 2018), 2018, : 913 - 919
  • [9] Developing a Knowledge-based Decision Support System for Prefabricated Prefinished Volumetric Construction
    Li, Y. S.
    Hwang, B. G.
    Shan, M.
    Looi, K. Y.
    4TH INTERNATIONAL CONFERENCE ON RESEARCH METHODOLOGY FOR BUILT ENVIRONMENT AND ENGINEERING 2019, 2019, 385
  • [10] Deep-Learning-Based Automated Building Construction Progress Monitoring for Prefabricated Prefinished Volumetric Construction
    Chua, Wei Png
    Cheah, Chien Chern
    SENSORS, 2024, 24 (21)