共 43 条
- [34] Partial safety factors for an existing single span railway bridge - Case study using an engineering based recalibration process LIFE-CYCLE OF STRUCTURAL SYSTEMS: DESIGN, ASSESSMENT, MAINTENANCE AND MANAGEMENT, 2015, : 808 - 815
- [35] Risk Assessment of Geological Hazards in a Tunneling Project Using Harmony Search Algorithm (Case Study: Ardabil-Mianeh Railway Tunnel) CIVIL ENGINEERING JOURNAL-TEHRAN, 2016, 2 (10): : 546 - 554
- [36] Evaluation of the Levels of Safety at Railway Level Crossings Using Data Envelopment Analysis (DEA) Method: A Case Study on Slovenian Railways EUROPEAN TRANSPORT-TRASPORTI EUROPEI, 2018, (67):
- [38] Rain-Induced Landslide Hazard Assessment Using Inception Model and Interpretability Method-A Case Study of Zayu County, Tibet APPLIED SCIENCES-BASEL, 2024, 14 (12):