Transaction costs in construction projects under uncertainty

被引:18
|
作者
Guo, Lei [1 ]
Li, Huimin [2 ]
Li, Peng [3 ]
Zhang, Chengyi [4 ]
机构
[1] North China Univ Water Resources & Elect Power, Dept Water Resources & Hydroelect Power, Zhengzhou, Peoples R China
[2] North China Univ Water Resources & Elect Power, Dept Construct Engn & Management, Zhengzhou, Peoples R China
[3] North China Univ Water Resources & Elect Power, Coll Ideol & Polit Educ, Zhengzhou, Peoples R China
[4] Eastern Kentucky Univ, Dept Appl Engn & Technol, Richmond, KY 40475 USA
基金
中国国家自然科学基金;
关键词
Structural equation modelling; Uncertainty; Construction project; Transaction costs; Construction management; JOINT VENTURES; INDUSTRY; MODEL;
D O I
10.1108/K-10-2014-0206
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
Purpose - The purpose of this paper is to find how those uncertainty factors influence transaction costs generated and to identify ways to minimize the transaction costs borne by the construction owner. Design/methodology/approach - The literature indicates that there is no consensus on a standard definition of transaction costs in the construction industry. A detailed literature review of research work on transaction costs in construction is conducted in order to identify the determinants of transaction costs in construction projects. A structural equation model is tested on data collected by means of a survey administered to construction owners. Findings - The findings indicate that the transaction costs borne by the owner can be minimized if the owner minimizes the uncertainties inherent in the construction project by making sure the engineering design is as complete as possible before bids are sought from contractors; harmonious relationships between project participants; fair risk allocation; have experience in similar type projects; and contractor selection practices that routinely detect irregular behavior. Research limitations/implications - The data used in this research are primarily based on the experiences of public owners and the markets in which they operate; a larger representation of private owners could make the conclusions more general. Another limitation of the study is that it relies on a survey of opinions rather than actual records of costs and other hard data. Practical implications - No empirical study has ever been conducted of transaction-related issues in the construction industry because of the lack of a common understanding of transaction cost. This paper provides the groundwork for such a study. Originality/value - This paper attempts to reconcile the many determinants of transaction costs in construction projects under uncertainty considered by different researchers in a multitude of research studies.
引用
收藏
页码:866 / 883
页数:18
相关论文
共 50 条
  • [31] BINARY MARKETS UNDER TRANSACTION COSTS
    Cordero, Fernando
    Klein, Irene
    Perez-Ostafe, Lavinia
    INTERNATIONAL JOURNAL OF THEORETICAL AND APPLIED FINANCE, 2014, 17 (05)
  • [32] Partial hedging under transaction costs
    Kamizono, K
    SIAM JOURNAL ON CONTROL AND OPTIMIZATION, 2003, 42 (05) : 1545 - 1558
  • [33] Inventory dynamics under transaction costs
    Chavas, JP
    Despins, PM
    Fortenbery, TR
    AMERICAN JOURNAL OF AGRICULTURAL ECONOMICS, 2000, 82 (02) : 260 - 273
  • [34] TRANSACTION COSTS, UNCERTAINTY AND GENERALLY INACTIVE FUTURES MARKETS
    SHEFRIN, HM
    REVIEW OF ECONOMIC STUDIES, 1981, 48 (01): : 131 - 137
  • [35] Relational Ties and Transaction Costs - The Moderating Role of Uncertainty
    Gerdoci, Blendi
    Skreli, Engjell
    Panariti, Suzana
    Repaj, Ermira
    INTERNATIONAL FOOD AND AGRIBUSINESS MANAGEMENT REVIEW, 2016, 19 (02): : 189 - 206
  • [36] Parameter Uncertainty in Multiperiod Portfolio Optimization with Transaction Costs
    DeMiguel, Victor
    Martin-Utrera, Alberto
    Nogales, Francisco J.
    JOURNAL OF FINANCIAL AND QUANTITATIVE ANALYSIS, 2015, 50 (06) : 1443 - 1471
  • [37] Risk minimization under transaction costs
    Paolo Guasoni
    Finance and Stochastics, 2002, 6 : 91 - 113
  • [38] Transaction costs for carbon sequestration projects in the tropical forest sector
    Timothy R. H. Pearson
    Sandra Brown
    Brent Sohngen
    Jennifer Henman
    Sara Ohrel
    Mitigation and Adaptation Strategies for Global Change, 2014, 19 : 1209 - 1222
  • [39] Stakeholder Perceptions of Transaction Costs in Prefabricated Housing Projects in China
    Wu, Hongjuan
    Qian, Queena K.
    Straub, Ad
    Visscher, Henk
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (01)