共 50 条
- [31] Solving manpower scheduling problem in manufacturing using mixed-integer programming with a two-stage heuristic algorithm INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 46 (9-12): : 1229 - 1237
- [32] Two-Stage Heuristic Algorithm for a New Model of Hazardous Material Multi-depot Vehicle Routing Problem ADVANCES IN COMPUTATIONAL INTELLIGENCE SYSTEMS, 2018, 650 : 362 - 366
- [33] Solving manpower scheduling problem in manufacturing using mixed-integer programming with a two-stage heuristic algorithm The International Journal of Advanced Manufacturing Technology, 2010, 46 : 1229 - 1237
- [35] A Two-Stage Resolution Search-Based Heuristic for the Team Orienteering Problem 2014 INTERNATIONAL CONFERENCE ON FUTURE INTERNET OF THINGS AND CLOUD (FICLOUD), 2014, : 442 - 447
- [37] A two-stage heuristic method for vehicle routing problem with split deliveries and pickups Journal of Zhejiang University SCIENCE C, 2014, 15 : 200 - 210
- [38] A linear programming based heuristic for solving a two-stage flowshop scheduling problem ETFA 2007: 12TH IEEE INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION, VOLS 1-3, 2007, : 392 - 397
- [39] A two-stage heuristic method for vehicle routing problem with split deliveries and pickups JOURNAL OF ZHEJIANG UNIVERSITY-SCIENCE C-COMPUTERS & ELECTRONICS, 2014, 15 (03): : 200 - 210
- [40] Lookahead batching heuristic for batch scheduling problem of two-stage hybrid flowshop Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (10): : 2559 - 2570