Removal of selected risk elements from wastewater in a horizontal subsurface flow constructed wetland

被引:4
|
作者
Sima, Jan [1 ]
Svoboda, Lubomir [1 ]
Seda, Martin [1 ]
Krejsa, Jiri [1 ]
Jahodova, Jana [1 ]
机构
[1] Univ South Bohemia, Dept Appl Chem, Fac Agr, Studentska 13, CZ-37005 Ceske Budejovice, Czech Republic
关键词
analysis; chemical; constructed wetlands; wastewater treatment; CADMIUM REMOVAL; HEAVY-METALS; ACCUMULATION; SEDIMENTS; MINERALS; VANADIUM; RELEASE;
D O I
10.1111/wej.12269
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Removal of Pb, Cd, Cr, Mo, V, Be and Ba from municipal wastewater using a horizontal subsurface flow constructed wetland was studied. The removal efficiencies attained for these elements were 50, 86, 71, 59, -53, 37 and 40%, respectively. The average inflow and outflow Pb concentrations were 1.5 and 0.7 mu g/L. Similarly, the inflow and outflow concentrations of 0.14 and 0.02 mu g/L were obtained for Cd. Cr inflow and outflow concentrations were 3.7 and 1.1 mu g/L, respectively. Concentrations of 0.78 and 0.32 mu g/L were measured for Mo. V was washed out from the system. Its average inflow and outflow concentrations were 4.8 and 7.4 mu g/L, respectively. Be inflow and outflow concentrations were rather low (1.03 and 0.65 mu g/L), however, the concentrations of Ba were significantly higher (189 and 113 mu g/L). The main perspective of the constructed wetland is the removal of toxic elements forming insoluble compounds (e.g. CdS) depositing in the wetland bed.
引用
收藏
页码:486 / 491
页数:6
相关论文
共 50 条
  • [41] Nitrogen and Phosphorus Accumulation in Horizontal Subsurface Flow Constructed Wetland
    Jakubaszek, Anita
    AGRONOMY-BASEL, 2021, 11 (07):
  • [42] Capacity of a horizontal subsurface flow constructed wetland system for the removal of emerging pollutants: An injection experiment
    Avila, Cristina
    Pedescoll, Anna
    Matamoros, Victor
    Maria Bayona, Josep
    Garcia, Joan
    CHEMOSPHERE, 2010, 81 (09) : 1137 - 1142
  • [43] APPLICATION OF ARTIFICIAL NEURAL NETWORK IN HORIZONTAL SUBSURFACE FLOW CONSTRUCTED WETLAND FOR NUTRIENT REMOVAL PREDICTION
    Ozengin, N.
    Elmaci, A.
    Yonar, T.
    APPLIED ECOLOGY AND ENVIRONMENTAL RESEARCH, 2016, 14 (04): : 305 - 324
  • [44] EFFICIENCY OF A SUBSURFACE FLOW CONSTRUCTED WETLAND FOR TREATING WASTEWATER FROM VEGETABLE PACKAGING
    Navarro, Amado E.
    Garcia, Yasmin
    Vazquez, Antonio
    Marrugo, Jose L.
    AVANCES EN CIENCIAS E INGENIERIA, 2013, 4 (01): : 39 - 50
  • [45] Nitrate Removal in Horizontal Subsurface Constructed Wetland with Cattail Litter Addition
    Liu, Gang
    Wen, Yue
    Zhou, Qi
    2010 4TH INTERNATIONAL CONFERENCE ON BIOINFORMATICS AND BIOMEDICAL ENGINEERING (ICBBE 2010), 2010,
  • [46] POLISHING DOMESTIC WASTEWATER ON A SUBSURFACE FLOW CONSTRUCTED WETLAND: ORGANIC MATTER REMOVAL AND MICROBIAL MONITORING
    Aguiar-Pinto Mina, I.
    Costa, M.
    Matos, A.
    Sousa Coutinho Calheiros, C.
    Castro, P. M. L.
    INTERNATIONAL JOURNAL OF PHYTOREMEDIATION, 2011, 13 (10) : 947 - 958
  • [47] Treating a lignite pyrolysis wastewater in a constructed subsurface flow wetland
    Wiessner, A
    Kuschk, P
    Stottmeister, U
    Struckmann, D
    Jank, M
    WATER RESEARCH, 1999, 33 (05) : 1296 - 1302
  • [48] Feasibility of using tuberose (P-tuberosa L.) in horizontal subsurface flow constructed wetland for heavy metal removal from domestic wastewater
    Singh, Mohini
    Srivastava, Rajeev K.
    ENVIRONMENTAL PROGRESS & SUSTAINABLE ENERGY, 2016, 35 (01) : 125 - 132
  • [49] Tertiary treatment of abattoir wastewater in a horizontal subsurface flow-constructed wetland under tropical conditions
    Department of Biological Sciences, College of Natural Sciences, Makerere University, P.O. Box 7062, Kampala, Uganda
    不详
    不详
    Int. J. Environ. Waste Manage., 3 (257-270):
  • [50] Developing horizontal subsurface flow constructed wetland using pumice and Chrysopogon zizanioides for tannery wastewater treatment
    Aregu M.B.
    Asfaw S.L.
    Khan M.M.
    Environmental Systems Research, 2021, 10 (01)