CONTRACTOR COSTS OF FACTORING ACCOUNT RECEIVABLES FOR A CONSTRUCTION PROJECT

被引:8
|
作者
Chen, Jieh-Haur [1 ]
Chen, Wei-Hsiang [1 ]
机构
[1] Natl Cent Univ, Inst Construct Engn & Management, Tao Yuan 32001, Taiwan
关键词
factoring; accounts receivable; cost; financing; construction project; MULTIOBJECTIVE OPTIMIZATION; FINANCE;
D O I
10.3846/13923730.2012.671272
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Literature reveals that approximately 66% of construction project funds are raised from financial institutions. The burden of capital costs on contractors is heavy and financial alternatives for the reduction of capital costs are always desired. The objective of this study is to derive a mathematical way of defining the contractor's costs for factoring account receivables, which is a form of commercial finance whereby a business sells its account receivables at a discount. Factoring can be thus considered as a contractor selling his/her accounts receivable to a factor, a financial institution that provides the services of financing, credit management, and collection. Nevertheless, factoring has far not been used for construction project financing. The relevant literature, empirical practices, and factoring theories from outside the construction industry are all evaluated and the features needed to derive the cost function are explored and integrated. This includes commission costs, expected debt costs, and credit monitoring costs. The case study is utilized and discussed to illustrate the use of factoring for a construction project and its related costs. Under the given assumptions that represent the most common financial conditions in Taiwan, the simulation results show that the contractor's factoring costs without recourse for the construction project make up only 0.8% of the total costs of the examined project which is relatively lower than that of most traditional financing. In addition, the application of factoring has the advantage of facilitating financial management, instantly improving cash flow, enhancement of investment efficiency, avoiding extra loan procedures, improving credit rating, and transfer of financial risk. Factoring is indeed a feasible financial tool for construction projects.
引用
收藏
页码:227 / 234
页数:8
相关论文
共 50 条
  • [31] Immigration and Construction: Analysis of the Impact of Immigration on Construction Project Costs
    Golden, Sabrina K.
    Skibniewski, Miroslaw J.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2010, 26 (04) : 189 - 195
  • [32] DEFENSES OF THE ACCOUNT DEBTOR IN INTERNATIONAL FACTORING
    GIRSBERGER, DL
    AMERICAN JOURNAL OF COMPARATIVE LAW, 1992, 40 (02): : 467 - 502
  • [33] Research on Contractor Evaluation and Selection Model Based on Construction Project Partnering Mode
    Feng, Zhuo
    Wang, Pei
    An, Gang
    2015 4th International Conference on Social Sciences and Society (ICSSS 2015), Pt 3, 2015, 72 : 56 - 61
  • [34] Marketing for the project: project marketing by the contractor
    Turner, John Rodney
    Lecoeuvre, Laurence
    Sankaran, Shankar
    Er, Michael
    INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2019, 12 (01) : 211 - 227
  • [35] Risk Management in Construction Project: Taking Sustainability into Account
    Bizon-Gorecka, Jadwiga
    Gorecki, Jaroslaw
    3RD WORLD MULTIDISCIPLINARY CIVIL ENGINEERING, ARCHITECTURE, URBAN PLANNING SYMPOSIUM (WMCAUS 2018), 2019, 471
  • [36] Risk Management in Construction Project: Taking Fairness into Account
    Gorecki, Jaroslaw
    Bizon-Gorecka, Jadwiga
    WORLD MULTIDISCIPLINARY CIVIL ENGINEERING-ARCHITECTURE-URBAN PLANNING SYMPOSIUM - WMCAUS, 2017, 245
  • [37] Research on PMO Construction of Enterprise-level for the Project General Contractor Enterprise
    Zhang Jianwei
    Zhu Minjie
    Zhang Liwei
    ADVANCES IN STRUCTURAL ENGINEERING, PTS 1-3, 2011, 94-96 : 2257 - +
  • [38] An analysis of the conspiring condition between supervisor and contractor during the project construction process
    Chen Yun
    Li Yixin
    Ouyang Xiongzan
    ICIC 2009: SECOND INTERNATIONAL CONFERENCE ON INFORMATION AND COMPUTING SCIENCE, VOL 1, PROCEEDINGS, 2009, : 348 - 350
  • [39] Optimal sub-contractor selection and allocation in a multiple construction project: Project portfolio planning in practice
    Afshar, Mohammad Reza
    Shahhosseini, Vahid
    Sebt, Mohammad Hassan
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2022, 73 (02) : 351 - 364
  • [40] COATINGS AND CONSTRUCTION CONTRACTOR
    CROALL, J
    MATERIALS PERFORMANCE, 1976, 15 (05) : 12 - 14