A two-stage method to determine the allocation and scheduling of medical staff in uncertain environments

被引:33
|
作者
Chen, Ping-Shun [1 ]
Lin, Ying-Jie [1 ]
Peng, Nai-Chun [1 ]
机构
[1] Chung Yuan Christian Univ, Dept Ind & Syst Engn, Taoyuan 320, Taiwan
关键词
Demand uncertainty; Goal programming; Staff size; Staff scheduling; Nurse scheduling; GOAL PROGRAMMING-MODEL; DECISION-MAKING; NURSING STAFF; SERVICE; NURSES; PERSPECTIVE; DEMAND; PRICE; SIZE;
D O I
10.1016/j.cie.2016.07.018
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Medical staff scheduling problems have received much attention from researchers. This research studies an integrated medical staff allocation and staff scheduling problem in uncertain environments. In order to solve the integrated problem, this research develops a two-stage algorithm based on goal programming to determine the smallest possible medical staff required and to create the best schedule for them. In the first stage, this study adopts a worst-case scenario approach to determine the minimum required medical staff. In the second stage, this study constructs hard and soft constraints for a monthly medical staff schedule and applies the analytic hierarchy process (AHP) to determine the penalty of soft constraints. By reducing the number of medical staff, this research determines the appropriate staff size based on the objective function of the constructed model. This research uses a medical image center and its radiological technologists as a case study. The results demonstrate that the proposed method can produce the appropriate number of radiological technologists based on different monthly workloads and can generate the least undesirable radiological technologist schedule. Hence, staff managers will have the ability and flexibility to assign different medical staff to each team department for each scheduling planning period in order to overcome the uncertainty of both patient issues and medical staff issues. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:174 / 188
页数:15
相关论文
共 50 条
  • [31] The uncertain two-stage network DEA models
    Bao Jiang
    Hao Chen
    Jian Li
    Waichon Lio
    Soft Computing, 2021, 25 : 421 - 429
  • [32] Risk in two-stage optimal resource allocation
    Naumov, AV
    Ulanov, SV
    AUTOMATION AND REMOTE CONTROL, 2003, 64 (07) : 1115 - 1121
  • [33] Risk in Two-Stage Optimal Resource Allocation
    A. V. Naumov
    S. V. Ulanov
    Automation and Remote Control, 2003, 64 : 1115 - 1121
  • [34] The optimal allocation of prizes in two-stage contests
    Alshech, Shahar
    Sela, Aner
    ECONOMICS LETTERS, 2021, 203
  • [35] Two-stage stochastic programming approach for limited medical reserves allocation under uncertainties
    Yuwei Zhang
    Zhenping Li
    Pengbo Jiao
    Shen Zhu
    Complex & Intelligent Systems, 2021, 7 : 3003 - 3013
  • [36] Two-stage stochastic programming approach for limited medical reserves allocation under uncertainties
    Zhang, Yuwei
    Li, Zhenping
    Jiao, Pengbo
    Zhu, Shen
    COMPLEX & INTELLIGENT SYSTEMS, 2021, 7 (06) : 3003 - 3013
  • [37] Scheduling two-stage jobs on multiple flowshops
    Wu, Guangwei
    Chen, Jianer
    Wang, Jianxin
    THEORETICAL COMPUTER SCIENCE, 2019, 776 : 117 - 124
  • [38] Bicriteria in a two-stage flowshop scheduling problem
    Bagga, PC
    Bhambani, A
    INDIAN JOURNAL OF PURE & APPLIED MATHEMATICS, 2000, 31 (11): : 1475 - 1481
  • [39] Scheduling multiple two-stage flowshops with a deadline
    Chen, Jianer
    Huang, Minjie
    Guo, Yin
    THEORETICAL COMPUTER SCIENCE, 2022, 921 : 100 - 111
  • [40] Two-stage production scheduling with an outsourcing option
    Lee, Kangbok
    Choi, Byung-Cheon
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 213 (03) : 489 - 497