Risk Analysis based on Fuzzy Comprehensive Evaluation for Maglev Train Bogie

被引:0
|
作者
Fan, Chengxin [1 ]
Dou, Fengshan [1 ]
Tong, Baiming [1 ]
Long, Zhiqiang [1 ]
机构
[1] Natl Univ Def Technol, Coll Mechatron Engn & Automat, Engn Res Ctr Maglev Technol, Changsha, Hunan, Peoples R China
关键词
maglev train; maglev bogie; risk analysis; analytic hierarchy process; fuzzy comprehensive evaluation; AHP;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The maglev bogie is the key subsystem for maglev train security. To ensure life and property security, it is essential to evaluate its risk level before its operation. However, due to the complexity and uncertainties of maglev bogies, a comprehensive and effective risk analysis method is needed. In this paper, a combinational method of analytic hierarchy process and fuzzy comprehensive evaluation is proposed to assess hazards in a complex maglev bogie system associated with multiple subsystems' failures. Our results show that the degree of maglev bogie's risk is within the range of acceptability. The merits of this work facilitate finding the weak links and determining the maintenance of maglev bogie system.
引用
收藏
页码:952 / 956
页数:5
相关论文
共 50 条
  • [41] Analysis for Debris Flow Disaster Insurance Risk in Sichuan Province Based on Fuzzy Comprehensive Evaluation
    Liu, Li
    Sun, Xipeng
    Wang, Shige
    Ye, Fan
    THEORY AND PRACTICE OF RISK ANALYSIS AND CRISIS RESPONSE, PROCEEDINGS, 2008, : 320 - +
  • [42] The assessment of traffic accident risk based on grey relational analysis and fuzzy comprehensive evaluation method
    Liu, Yaolong
    Huang, Xiaoli
    Duan, Jin
    Zhang, Huaming
    NATURAL HAZARDS, 2017, 88 (03) : 1409 - 1422
  • [43] The assessment of traffic accident risk based on grey relational analysis and fuzzy comprehensive evaluation method
    Yaolong Liu
    Xiaoli Huang
    Jin Duan
    Huaming Zhang
    Natural Hazards, 2017, 88 : 1409 - 1422
  • [44] Fuzzy comprehensive evaluation of fire safety risk of historic buildings based on fuzzy mathematics
    Yu, Kanhua
    International Journal of Applied Mathematics and Statistics, 2013, 50 (20): : 396 - 405
  • [45] Fuzzy comprehensive evaluation model for construction risk analysis in urban subway
    Dai, Chun-Quan
    Zhao, Zeng-Hui
    INTERNATIONAL JOURNAL OF MODELING SIMULATION AND SCIENTIFIC COMPUTING, 2015, 6 (03)
  • [46] Fuzzy Hierarchy Comprehensive Evaluation on Dam-break Risk Analysis
    Wang Xiaoling
    Zhou Zhengyin
    Sun Ruirui
    Zhou Shasha
    MANUFACTURING SCIENCE AND TECHNOLOGY, PTS 1-8, 2012, 383-390 : 2151 - +
  • [47] The Fuzzy Comprehensive Evaluation of Real Estate Development Risk Based on AHP
    Li Jinghua
    Sun Yan
    ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 2, 2010, : 118 - 122
  • [48] Research on the risk assessment of IPD mode based on the fuzzy comprehensive evaluation
    Xu, Yongge
    Lv, Peng
    FRONTIERS OF MECHANICAL ENGINEERING AND MATERIALS ENGINEERING II, PTS 1 AND 2, 2014, 457-458 : 1181 - 1184
  • [49] Research on financing risk of mining enterprises based on fuzzy comprehensive evaluation
    Yunchao, Du
    Luyi, Shi
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2020, 38 (06) : 7001 - 7007
  • [50] Risk assessment of virtual enterprise based on the fuzzy comprehensive evaluation method
    School of Business, Hubei University, 430062, China
    IFIP Advances in Information and Communication Technology, 2007, (58-66)