Projects portfolio determination based on key stakeholders' expectations and requirements: Evidence from public university projects

被引:3
|
作者
Cheshmberah, Mohsen [1 ]
机构
[1] Malek Ashtar Univ Technol, Fac Management & Ind Engn, Tehran, Iran
关键词
Stakeholders analysis; Stakeholder identifying; Power/Interest matrix; Public university; Project portfolio management; Mathematical model;
D O I
10.5267/j.jpm.2019.10.001
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Project stakeholder management deals with managing and fulfilling stakeholder expectations and has tended to focus on the stakeholders of the organization or the project viewpoint. The thematic, spatial and temporal objects of the research were to analyze the stakeholders and projects portfolio determination based on key stakeholders of a public university in Iran in 2019. In first step, stakeholders are identified. There are 12 stakeholder groups involved the university under study. In the second step using the power/interest matrix, stakeholder categorization and positioning was performed. In the following, a mathematical model for optimizing the portfolio of projects was presented and solved. This model was developed to maximize college profit while simultaneously considering the expectations and the requirements of four key stakeholders - the board of trustees, faculty members, researchers and the Ministry of Science. These findings may mainly reflect the strategic decisions at the university. (C) 2020 by the authors; licensee Growing Science, Canada.
引用
收藏
页码:139 / 150
页数:12
相关论文
共 50 条
  • [11] The Practice of Public Engagement on Projects: From Managing External Stakeholders to Facilitating Active Contributors
    Chow, Vivien
    Leiringer, Roine
    PROJECT MANAGEMENT JOURNAL, 2020, 51 (01) : 24 - 37
  • [12] Exploring the key drivers of inter-organizational knowledge transfer in projects: evidence from international construction projects
    Zhou, Qianwen
    Deng, Xiaopeng
    Wang, Ge
    Mahmoudi, Amin
    Zhang, Na
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024,
  • [13] Key Success Indicators for PPP Projects: Evidence from Hong Kong
    Liang, Yanhong
    Jia, Hongjun
    ADVANCES IN CIVIL ENGINEERING, 2018, 2018
  • [14] Performance Objectives Selection Model in Public-Private Partnership Projects Based on the Perspective of Stakeholders
    Yuan, Jingfeng
    Skibniewski, Miroslaw J.
    Li, Qiming
    Zheng, Lei
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2010, 26 (02) : 89 - 104
  • [15] Education Projects for Sustainable Development: Evidence from Ural Federal University
    Volkova, Marina V.
    Stoffers, Jol
    Kochetkov, Dmitry M.
    CHANGING SOCIETIES & PERSONALITIES, 2019, 3 (03): : 225 - 242
  • [16] Unit Costs of Public and PPP Road Projects: Evidence from India
    Meduri, Surya Sudheer
    Annamalai, Thillai Rajan
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (01) : 35 - 43
  • [17] PROCUREMENT SELECTION CRITERIA FOR PROJECTS IN THE PUBLIC SECTOR: EVIDENCE FROM NIGERIA
    Jimoh, Richard Ajayi
    Oyewobi, Luqman Oyekunle
    Aliu, Nurayn Olanrewaju
    INDEPENDENT JOURNAL OF MANAGEMENT & PRODUCTION, 2016, 7 (04): : 1096 - 1114
  • [18] Key constraints to labour productivity in residential building projects: evidence from Cambodia
    Durdyev, Serdar
    Mbachu, Jasper
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2018, 18 (05) : 385 - 393
  • [19] Identification of key stakeholders and social stability risk factors for large-scale engineering projects based on SNA
    Xu C.
    Yu D.
    Luo H.
    Journal of Railway Science and Engineering, 2024, 21 (05) : 2048 - 2058
  • [20] Dissemination of Evidence-Based Practice Projects: Key Strategies for Successful Poster Presentations
    Beckett, Cynthia D.
    Powell, Julie
    WORLDVIEWS ON EVIDENCE-BASED NURSING, 2021, 18 (03) : 158 - 160