Professional Company Agent and Full Process Management:Analysis of Construction-Agent System in China

被引:0
|
作者
Yang Lifeng [1 ]
Lv Wenxue [1 ]
机构
[1] Lanzhou Univ Tech China, Sch Civil Engn, Dept Construct Management, Lanzhou 730050, Gansu, Peoples R China
关键词
Government investment; Project construction-agent system; Management of full process;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
High investment and low efficiency in public projects is a challenge in the world. System innovation of public project output has been re-concerned in many countries. From four-in-one at the beginning of reform to construction-agent system advocated by government now, management of government investment project is constantly developing. But some new problems came out simultaneously in application of construction-agent system(CAS), for example, inconsistent target, distrust, and even suspending in the process. This paper presents that the root cause of these problems is that frequent intervention from owner out of the Construction-Agent system and limitation to Construction-Agent party in working scope, which put the Construction-Agent party into the dilemma where Construction-Agent exists only in name. To ensure steady implementation of Construction-Agent and promote its improvement, the root cause should be resolved in Construction-Agent system, namely, the essence and the working scope of Construction-Agent should be defined, and the effective form of Construction-Agent should be determined at the same time. This paper has analyzed development course and typical types of implementation mode of Construction-Agent at the present time,and then, through case analysis of one section in South-to-North water diversion project and a settlement houses project in Jiangsu Province, this paper concludes that professional engineering consulting company should be the best agent party in the future, which should participate in the full process management from project planning to completion.
引用
收藏
页码:2538 / 2541
页数:4
相关论文
共 50 条
  • [41] 4.2.2 Agent-Based Process Management
    Debenham, John
    INCOSE International Symposium, 2001, 11 (01) : 274 - 282
  • [42] Risk Analysis and Preventive Solution on Agent-construction System of National Repository Construction Project
    Pei, Zaibo
    Pei, Jinlu
    2017 6TH INTERNATIONAL CONFERENCE ON APPLIED SOCIAL SCIENCE (ICASS 2017), PT 1, 2017, 97 : 289 - 291
  • [43] Multi-agent System Using Scrum Methodology for Software Process Management
    Ali, Shanawar
    Ali, Hafiz Hassan
    Qayyum, Sakha
    Sohail, Fatima
    Tahir, Faiza
    Maqsood, Sahar
    Adil, Mahum
    INTELLIGENT TECHNOLOGIES AND APPLICATIONS, INTAP 2018, 2019, 932 : 787 - 792
  • [44] Multi-Agent based chemical plant process monitoring and management system
    Hairui, Wang
    Yong, Zhang
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 12222 - 12225
  • [45] Intelligent Multi-Agent Based Information System of Business Process Management
    Wang Duo
    Li Yi
    Li Wenhui
    Jiang Qi
    Yi Rongqing
    PACIIA: 2008 PACIFIC-ASIA WORKSHOP ON COMPUTATIONAL INTELLIGENCE AND INDUSTRIAL APPLICATION, VOLS 1-3, PROCEEDINGS, 2008, : 1432 - 1436
  • [46] A process-agent construction method for software process modeling in SoftPM
    Wang, Qing
    Xiao, Junchao
    Li, Mingshu
    Nisar, M. Wasif
    Yuan, Rong
    Zhang, Lei
    SOFTWARE PROCESS CHANGE, 2006, 3966 : 204 - 213
  • [47] The Developer Agent-construction Mode in Affordable Housing Construction and Management
    Chen, Xiaolin
    Zhu, Jian
    Meo, Peng
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 3386 - 3390
  • [48] Agent based modeling: a tool for construction engineering and management?
    Araya, F.
    REVISTA INGENIERIA DE CONSTRUCCION, 2020, 35 (02): : 111 - 118
  • [49] Agent or Borrower? An Incentive of Moral Hazard with China Commercial Guarantee Company
    He, Feng
    Zhang, Wei
    Zhang, Yongjie
    Xiong, Xiong
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014
  • [50] Review of Agent Construction Management for Government Investment Projects
    Yi, Honglei
    Wang, Yousong
    Pang, Yongshi
    ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 3235 - +