Research on mathematical model of quay container crane simulation training system

被引:0
|
作者
Liang, Chengji [1 ]
Huang, Youfang [1 ]
Wang, Chonghua [1 ]
机构
[1] Shanghai Maritime Univ, Logist Res Ctr, Shanghai, Peoples R China
关键词
simulation training system; mathematical model; modularization;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this thesis, we Put forward for the time the establishing of structure of mathematical model of quay container crane Simulation training, and we establish the simulation mathematical models suited to the system of quay container crane Simulation training: mechanism dynamic model, collision reaction model, malfunction model,, evaluation model, instructor control model etc to develop more practical simulation training system, to Put it Into practical application and produce real productivity.
引用
收藏
页码:206 / 211
页数:6
相关论文
共 50 条
  • [41] A robust multiobjective model for the integrated berth and quay crane scheduling problem at seaside container terminals
    Nourmohammadzadeh, Abtin
    Voss, Stefan
    ANNALS OF MATHEMATICS AND ARTIFICIAL INTELLIGENCE, 2022, 90 (7-9) : 831 - 853
  • [42] Integration of Berth Allocation and Quay Crane Assignment in Tidal Container Ports
    陆志强
    吴文
    韩笑乐
    NIRAVONG Juliane
    Journal of Donghua University(English Edition), 2015, 32 (04) : 559 - 564
  • [43] Scheduling of Quay Crane at Container Terminals based on Ant Colony Algorithm
    Xiao Jianmei
    Wang Xihuai
    Ouyang Lingping
    2011 INTERNATIONAL CONFERENCE ON MACHINE INTELLIGENCE (ICMI 2011), PT 2, 2011, 4 : 586 - 592
  • [44] Integrated Quay Crane and Yard Truck Schedule Problem in Container Terminals
    曹瑾鑫
    史其信
    Der-Horng Lee
    Tsinghua Science and Technology, 2010, 15 (04) : 467 - 474
  • [45] A quay crane assignment approach for berth allocation problem in container terminal
    Hu, Zhi-Hua
    2010 THIRD INTERNATIONAL SYMPOSIUM ON INTELLIGENT INFORMATION TECHNOLOGY AND SECURITY INFORMATICS (IITSI 2010), 2010, : 17 - 21
  • [46] A survey of berth allocation and quay crane scheduling problems in container terminals
    Bierwirth, Christian
    Meisel, Frank
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 202 (03) : 615 - 627
  • [47] Quay crane scheduling with time windows constraints for automated container port
    Wei, Minghui
    He, Junliang
    Tan, Caimao
    Yue, Jiantao
    Yu, Hang
    OCEAN & COASTAL MANAGEMENT, 2023, 231
  • [48] An exact algorithm for scheduling tandem quay crane operations in container terminals
    Kong, Lingrui
    Ji, Mingjun
    Gao, Zhendi
    Transportation Research Part E: Logistics and Transportation Review, 2022, 168
  • [49] Optimal Quay Crane Assignment and Scheduling in Port's Container Terminals
    Al-Refaie, Abbas
    Abedalqader, Hala
    JORDAN JOURNAL OF MECHANICAL AND INDUSTRIAL ENGINEERING, 2021, 15 (02): : 153 - 167
  • [50] An exact algorithm for scheduling tandem quay crane operations in container terminals
    Kong, Lingrui
    Ji, Mingjun
    Gao, Zhendi
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2022, 168