共 50 条
- [42] Model parameters updating of lunar lander Beijing Hangkong Hangtian Daxue Xuebao/Journal of Beijing University of Aeronautics and Astronautics, 2013, 39 (10): : 1366 - 1369
- [43] Technical Feasibility and Relative Productivity of Alternate NASA Robotic Missions to a Lunar Dark Crater IEEE SYSTEMS JOURNAL, 2008, 2 (01): : 120 - 128
- [45] Lunar Lander Mission Evaluation Lab 2009 IEEE AEROSPACE CONFERENCE, VOLS 1-7, 2009, : 4226 - 4233
- [47] Nasa's involvement in technology development and transfer: The Ohio hybrid bus project PROCEEDINGS: ELECTRICAL INSULATION CONFERENCE AND ELECTRICAL MANUFACTURING & COIL WINDING CONFERENCE, 1997, : 449 - 453
- [48] NASA stops listening for Mars Polar Lander AVIATION WEEK & SPACE TECHNOLOGY, 2000, 152 (04): : 32 - 32
- [49] BUILDING FAULT TOLERANCE INTO NASA'S LUNAR RECONNAISSANCE ORBITER GUIDANCE AND CONTROL 2008, 2008, 131 : 175 - +
- [50] Moon bound: choosing and preparing NASA's lunar astronauts Moon Bound: Choosing and Preparing NASA's Lunar Astronauts, 2013, : 1 - 371