Temporary Support Design on Large-span Casting Box Girder Of the Songpu Bridge

被引:1
|
作者
Wang, Haijun [1 ]
Xue, Zhicheng [1 ]
Han, Ziqian [1 ]
机构
[1] Heilongjiang Inst Sci & Technol, Coll Construct & Engn, Harbin 150027, Peoples R China
关键词
Casting Large-span Box Girder; Temporary support; Allowable stress;
D O I
10.4028/www.scientific.net/AMM.99-100.304
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
By the study of construction of casting box girder of Songpu Bridge in Harbin, and the actual site geology, hydrology and the corresponding norms, this paper designed temporary support with the method of allowable stress. It was proved that the temporary support met the need of the site construction, both to ensure casting construction quality, but also save construction costs and speed up the construction progress, which provided a new way for the construction of large-span continuous box girder.
引用
收藏
页码:304 / 307
页数:4
相关论文
共 50 条
  • [41] Study on the Factory Prefabrication Technology of Large-span Bridge's Pier
    Wu Qihe
    Qiu Zhengzhong
    Niu Zhao
    ADVANCES IN CIVIL AND STRUCTURAL ENGINEERING III, PTS 1-4, 2014, 501-504 : 1413 - 1417
  • [42] Impacts of prestress loss on the deflection for large-span prestressed concrete continuous girder bridges
    Bu, Jian-Qing
    Cui, Jin-Can
    Journal of Railway Engineering Society, 2014, 31 (07) : 57 - 61
  • [43] Study on foundation slope stability of large-span high tower bridge
    School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, China
    不详
    Yanshilixue Yu Gongcheng Xuebao, 2007, SUPPL. 1 (3177-3182):
  • [44] Simulation method of random ground motion for large-span bridge in service
    Zhao, J. (tongfeibridge@126.com), 1600, Chang'an University (13):
  • [45] Optimization for temporary support unloading scheme and on-site monitoring of large-span column-free underground station
    Lin H.
    Hou W.
    Qin X.
    Duan L.
    Liu Y.
    Jianzhu Jiegou Xuebao/Journal of Building Structures, 2023, 44 (03): : 294 - 302
  • [46] Stochastic Analysis of a Large-Span Continuous Girder High-Speed Railway Bridge under Fully Non-Stationary Earthquake
    Xing, Chenxi
    Wang, Hao
    Xu, Zidong
    Liang, Ruijun
    APPLIED SCIENCES-BASEL, 2022, 12 (24):
  • [47] Calculation method of temporary cable force in incremental launching construction of large span steel box girder without auxiliary pier
    Liu, Zengwu
    Zhao, Kunpeng
    Xiong, Yuanshun
    Wang, Baoqun
    SCIENTIFIC REPORTS, 2024, 14 (01):
  • [48] Numerical Simulation of Static Wind Coefficient and Flow Field of Box Girder of High Pier and Large Span Continuous Bridge
    Zhou, Zhipeng
    Jiang, Guangbiao
    PROCEEDINGS OF THE 2017 3RD INTERNATIONAL FORUM ON ENERGY, ENVIRONMENT SCIENCE AND MATERIALS (IFEESM 2017), 2017, 120 : 299 - 305
  • [49] Analysis of Support Box Girder During Large Tonnage Box Girder Transport on Girders in Curve Segment
    Wang, Jianqiang
    Zhu, Guangjie
    Wang, Fei
    Zhao, Zhuo
    Journal of Railway Engineering Society, 41 (03): : 45 - 51
  • [50] EFFECT OF LATERAL BRACE STIFFNESS OF A LARGE-SPAN STEEL ARCH BRIDGE ON RESPONSE OF THE WHOLE BRIDGE
    Li, Zilin
    Zhao, Xiaohui
    Ge, Zhitao
    PROCEEDINGS OF INTERNATIONAL CONFERENCE ON EARTHQUAKE ENGINEERING - THE FIRST ANNIVERSARY OF WENCHUAN EARTHQUAKE, 2009, : 474 - 477