A Novel Method for Calculating the Radiated Disturbance From Pantograph Arcing in High-Speed Railway

被引:32
|
作者
Ma, Lan [1 ,2 ]
Wen, Yinghong [1 ,2 ]
Marvin, Andy [3 ,4 ]
Karadimou, Eva [4 ]
Armstrong, Rob [4 ]
Cao, Hefei [1 ,2 ]
机构
[1] Beijing Jiaotong Univ, Electromagnet Compatibil Lab, Sch Elect & Informat Engn, Beijing 100044, Peoples R China
[2] EMC & GNSS Technol Rail Transportat, Beijing Engn Res Ctr, Beijing 100044, Peoples R China
[3] Univ York, Dept Elect Engn, York YO10 5DD, N Yorkshire, England
[4] York EMC Serv Ltd, York YO10 5DD, N Yorkshire, England
关键词
Pantograph arcing; radiated disturbance; reverberation chamber; PARAMETERS; MECHANISM;
D O I
10.1109/TVT.2017.2704611
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Pantograph arcing is a key electromagnetic disturbance source to affect train control system in high-speed railway. Since the characteristics of pantograph arcing are related to train speed, it is necessary to investigate effective numerical modeling and measurement method. However, due to the uncontrollable train speed during onsite measurement, it is difficult to study the radiated disturbance from arcing in the corresponding speed and repeat the same measurement. Therefore, a method that combines numerical modeling and reverberation chamber measurements for calculating the radiated disturbance from pantograph arcing in a high-speed railway is proposed. Numerical models of train and sensitive equipment are built to calculate the coupling coefficient in CONCEPT II. And a new measurement procedure in reverberation chamber using pulse signal as the reference source is proposed based on a speed-controllable laboratory replica to measure the total radiated power of pantograph arcing. Then, the radiated disturbance from pantograph arcing to the sensitive equipment is achieved with the coupling coefficient and the total radiated power of arcing. The method is verified by laboratory experiments. This method can solve the uncontrollable train speed problem during on-site measurement and improve the repeatability of measurement.
引用
收藏
页码:8734 / 8745
页数:12
相关论文
共 50 条
  • [31] EMI effect of pantograph catenary arc of high-speed railway on aircraft approach landing
    Lu H.
    Zhang Q.
    Hangkong Xuebao/Acta Aeronautica et Astronautica Sinica, 2020, 41 (10):
  • [32] Analysis of the pantograph's mass distribution affecting the contact quality in high-speed railway
    Wang, Jiangwen
    Mei, Guiming
    Lu, Liantao
    INTERNATIONAL JOURNAL OF RAIL TRANSPORTATION, 2023, 11 (04) : 529 - 551
  • [33] Wave propagation analysis in high-speed railway catenary system subjected to a moving pantograph
    Song, Yang
    Liu, Zhigang
    Duan, Fuchuan
    Xu, Zhao
    Lu, Xiaobing
    APPLIED MATHEMATICAL MODELLING, 2018, 59 : 20 - 38
  • [35] Longitudinal Propagation Characteristic of Pantograph Arcing Electromagnetic Emission With High-Speed Train Passing the Articulated Neutral Section
    Li, Xin
    Zhu, Feng
    Lu, Hede
    Qiu, Riqiang
    Tang, Yutao
    IEEE TRANSACTIONS ON ELECTROMAGNETIC COMPATIBILITY, 2019, 61 (02) : 319 - 326
  • [36] High-Speed Railway and Firm Innovation: Evidence from DID Method
    吉赟
    杨青
    China Economist, 2021, 16 (02) : 60 - 72
  • [37] A method for calculating the consolidation and creep-induced settlement of bridge pile foundation of high-speed railway
    Zhou, Tao
    Xu, Fang
    Yang, Qi
    Wu, Yafei
    Journal of Railway Science and Engineering, 2021, 18 (08) : 1968 - 1977
  • [38] A Novel Video Monitoring System in High-Speed Railway
    Shi, Haoyi
    Wu, Hao
    Tang, Hengliang
    Wen, Shiya
    2011 6TH INTERNATIONAL ICST CONFERENCE ON COMMUNICATIONS AND NETWORKING IN CHINA (CHINACOM), 2011, : 1176 - 1180
  • [39] HIGH-SPEED CINEMATOGRAPHIC ANALYSIS OF SWITCH ARCING
    不详
    INTERNATIONALE ELEKTRONISCHE RUNDSCHAU, 1974, 28 (07): : 143 - 143
  • [40] Integrated Automatic Timetabling Method for High-speed Railway
    An D.
    Wu J.
    Zhang Y.
    Tiedao Xuebao/Journal of the China Railway Society, 2024, 46 (02): : 12 - 21