The foundations for a 500 m long cable-stayed bridge and its approaches in India included 676 large-diameter shafts drilled to lengths of 4 to 34 m in geotechnical conditions that varied from highly weathered volcanic material to massive, high-strength rocks. The key to success was a program of pier-by-pier design and careful in situ testing.
机构:
Mechanical Engineering College of Hubei University of Automotive Technology, Shiyan, Hubei, ChinaMechanical Engineering College of Hubei University of Automotive Technology, Shiyan, Hubei, China