Power drill

被引:0
|
作者
Felice, CW [1 ]
Brenniman, H
机构
[1] LACHEL FELICE & Associates Inc, Kirkland, WA USA
[2] AMEC Earth & Environm Inc, Kirkland, WA USA
来源
CIVIL ENGINEERING | 2005年 / 75卷 / 05期
关键词
D O I
10.1061/ciegag.0000018
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The foundations for a 500 m long cable-stayed bridge and its approaches in India included 676 large-diameter shafts drilled to lengths of 4 to 34 m in geotechnical conditions that varied from highly weathered volcanic material to massive, high-strength rocks. The key to success was a program of pier-by-pier design and careful in situ testing.
引用
收藏
页码:64 / 71
页数:8
相关论文
共 50 条