An Improved MOEA/D Algorithm for the Carbon Black Production Line Static and Dynamic Multiobjective Scheduling Problem

被引:0
|
作者
Wang, Yao [1 ]
Dong, Zhiming [2 ]
Hu, Tenghui [3 ]
Wang, Xianpeng [4 ]
机构
[1] Northeastern Univ, Minist Educ, Key Lab Data Analyt & Optimizat Smart Ind, Shenyang, Peoples R China
[2] Northeastern Univ, Liaoning Engn Lab Operat Analyt & Optimizat Smart, Shenyang, Peoples R China
[3] Northeastern Univ, Liaoning Key Lab Mfg Syst & Logist, Shenyang, Peoples R China
[4] Northeastern Univ, Inst Ind & Syst Engn, Shenyang, Peoples R China
来源
2020 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC) | 2020年
基金
中国国家自然科学基金; 国家自然科学基金重大项目;
关键词
MTO; order static scheduling; rush order dynamic rescheduling; multiobjecfive optimization; MOEA/D;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The make-to-order (MTO) manufacturers generally make production plans based on orders, which can help enterprises effectively avoid market risks, reduce market pressure and improve competitiveness. However, due to the characteristics of MTO production mode, the order static scheduling problem and rush order dynamic rescheduling problem have become more and more important for these MTO manufacturers. Therefore, in this paper, we take the packaging production line of a typical carbon black production enterprise as the research background to study the carbon black production line static and dynamic multiobjective scheduling problem. Firstly, multiobjective optimization models of both order static scheduling and rush order dynamic rescheduling are established. Then the improved MOEA/D algorithm combined the heuristic algorithm based on heuristic rules and discrete dynamic local search is developed to solve these two models. Based on the actual production data, eight instances of order static scheduling problems of different scales and four instances of rush order dynamic rescheduling problems of different scales are constructed respectively. Experimental results illustrate that the improved MOEA/D is effective and superior in solving these two problems.
引用
收藏
页数:8
相关论文
共 50 条
  • [41] RETRACTED: An Effective Hybrid Multiobjective Flexible Job Shop Scheduling Problem Based on Improved Genetic Algorithm (Retracted Article)
    Fang, Junfeng
    SCIENTIFIC PROGRAMMING, 2022, 2022
  • [42] An Improved Genetic Algorithm with Rolling Window Technology for Dynamic Integrated Process Planning and Scheduling Problem
    Yin, Lvjiang
    Gao, Liang
    Li, Xinyu
    Xia, Hao
    2017 IEEE 21ST INTERNATIONAL CONFERENCE ON COMPUTER SUPPORTED COOPERATIVE WORK IN DESIGN (CSCWD), 2017, : 414 - 419
  • [43] An Improved Dynamic Hierarchical Scheduling Algorithm Design for QoS in IEEE 802.16d
    Yu, Xiang
    Ma, Guanghao
    Wang, Guidong
    INTERNATIONAL CONFERENCE ON REMOTE SENSING AND WIRELESS COMMUNICATIONS (RSWC 2014), 2014, : 230 - 237
  • [44] SIMULATION OF FLOW LINE SCHEDULING OF PRODUCTION ENTERPRISES BASED ON IMPROVED ARTIFICIAL FISH SWARM ALGORITHM
    Lin, C.
    Yang, B.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2018, 17 (03) : 512 - 520
  • [45] Optimal scheduling of material handling devices in a PCB production line: Problem formulation and a polynomial algorithm
    Che, Ada
    Chu, Chengbin
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2008, 2008
  • [46] An Improved Differential Evolution Algorithm for Practical Dynamic Scheduling in Steelmaking-Continuous Casting Production
    Tang, Lixin
    Zhao, Yue
    Liu, Jiyin
    IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2014, 18 (02) : 209 - 225
  • [47] A Variable Interval Rescheduling Strategy for Dynamic Flexible Job Shop Scheduling Problem by Improved Genetic Algorithm
    Wang, Lei
    Luo, Chaomin
    Cai, Jingcao
    JOURNAL OF ADVANCED TRANSPORTATION, 2017,
  • [48] An Improved Q Learning Algorithm to Optimize Green Dynamic Scheduling Problem in a Reentrant Hybrid Flow Shop
    Wu, Xiuli
    Yan, Xiaoyan
    Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2023, 59 (13): : 246 - 259
  • [49] Solving identical parallel machine production line scheduling problem with special procedure constraint by genetic algorithm
    Liu, Min
    Wu, Cheng
    Yin, Wen-Jun
    Zidonghua Xuebao/Acta Automatica Sinica, 2001, 27 (03): : 381 - 386
  • [50] A Pareto-Based Discrete Jaya Algorithm for Multiobjective Carbon-Efficient Distributed Blocking Flow Shop Scheduling Problem
    Zhao, Fuqing
    Zhang, Hui
    Wang, Ling
    IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2023, 19 (08) : 8588 - 8599