Trade-off Between Cost and Safety To Cope with Station Blackout in A PWR in A Deregulated Electricity Market

被引:0
|
作者
Ahmad Khanbeigi, Ghafour [1 ]
Jahanfarnia, Gholamreza [1 ]
Sharifloo, Naser Mansour [1 ]
Sheikh-el-Eslami, Mohamad Kazem [2 ]
Karimi, Kaveh [3 ]
机构
[1] Islamic Azad Univ, Dept Nucl Engn, Sci & Res Branch, Tehran, Iran
[2] Tarbiat Modares Univ, Power Syst Lab, Tehran, Iran
[3] Islamic Azad Univ, East Tehran Branch, Tehran, Iran
关键词
PWR safety; Station blackout; Payback period; Economics; COMPLEMENTARITY MODELS; POWER-PLANTS; ENERGY;
D O I
10.1007/s42835-020-00488-5
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In this paper a close solution is presented to determine the trade-off between cost and safety to cope with station blackout (SBO) in Pressurized Water Reactors (PWRs). To compute the profit of each generation unit, a Supply Function Equilibrium (SFE) model swhich considers carbon tax is used in a uniform electricity market. A hierarchical heuristic method is applied for decision making on safety improvement of Nuclear Power Plants (NPPs). In this method the break-even point is used as a criterion to make a decision on comparing cost of safety improvement and profit of NPP in a deregulated electricity market. This method is applied in a case of adding an Emergency Water Supply (EWS) and an Emergency Diesel Generator (EDG) to a NPP where impacts of its investment cost and its profit are investigated. The achieved results show that the break-even point of investment cost and net profit of the NPP by adding the EDG is one month later than NPP with addition of EWS.
引用
收藏
页码:2045 / 2056
页数:12
相关论文
共 50 条
  • [1] Trade-off Between Cost and Safety To Cope with Station Blackout in A PWR in A Deregulated Electricity Market
    Ghafour Ahmad Khanbeigi
    Gholamreza Jahanfarnia
    Naser Mansour Sharifloo
    Mohamad Kazem Sheikh-el-Eslami
    Kaveh Karimi
    Journal of Electrical Engineering & Technology, 2020, 15 : 2045 - 2056
  • [2] Analysis of economics and safety to cope with station blackout in PWR
    Al Shehhi, Ahmed Saeed
    Chang, Soon Heung
    Kim, Sang Ho
    Kang, Hyun Gook
    ANNALS OF NUCLEAR ENERGY, 2013, 59 : 63 - 71
  • [3] Trade-off between quality and cost
    Huang, YF
    QUALITY & QUANTITY, 2001, 35 (03) : 265 - 276
  • [4] Trade-off between Quality and Cost
    Ying-Fang Huang
    Quality and Quantity, 2001, 35 : 265 - 276
  • [5] Trade-off between safety and cost in planning construction site layouts
    El-Rayes, K
    Khalafallah, A
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2005, 131 (11): : 1186 - 1195
  • [6] A trade-off method between cost and reliability
    Burnett, R
    XVII INTERNATIONAL CONFERENCE OF THE CHILEAN COMPUTER SCIENCE SOCIETY, PROCEEDINGS, 1997, : 21 - 28
  • [7] The trade-off between safety and flow of traffic
    Meng, Jingsong
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON EDUCATION TECHNOLOGY, MANAGEMENT AND HUMANITIES SCIENCE (ETMHS 2015), 2015, 27 : 847 - 852
  • [8] Drug shortages in European countries: a trade-off between market attractiveness and cost containment?
    Kim Pauwels
    Isabelle Huys
    Minne Casteels
    Steven Simoens
    BMC Health Services Research, 14
  • [9] Drug shortages in European countries: a trade-off between market attractiveness and cost containment?
    Pauwels, Kim
    Huys, Isabelle
    Casteels, Minne
    Simoens, Steven
    BMC HEALTH SERVICES RESEARCH, 2014, 14
  • [10] On the Trade-off between Cost and Availability of Virtual Networks
    Herker, Sandra
    Kiess, Wolfgang
    An, Xueli
    Kirstaedter, Andreas
    2014 IFIP NETWORKING CONFERENCE, 2014,