Experiences from construction and operation of OP cable plants in sewer systems

被引:0
|
作者
Liese, W [1 ]
Pastuszka, S [1 ]
机构
[1] Alcatel Cable, D-41238 Moenchengladbach, Germany
来源
EUROCABLE | 2000年
关键词
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The current efforts to create new fiber optic access networks throughout Europe are driven by the booming demand for internet services, the liberalization of the markets with a host of new players and finally the lack of capacity of the traditional access networks. Sewers provide excellent opportunities for access networks, since they reach about every corner of the city and pass all potential customers. Utilizing sewers avoids bureaucratic digging approvals and reduces the cost below traditional digging installations. This paper reviews the technique and experiences gained from sewer installations during planning and construction of the sewer access networks, reviews the design of dedicated cables, and components and describes the cable laying robot and observations from operations.
引用
收藏
页码:26 / 35
页数:10
相关论文
共 50 条
  • [21] PRACTICAL EXPERIENCES MADE WITH TRIAL OPERATION OF CHEMICAL PLANTS
    BERGER, KH
    SCHAAF, H
    STRAUBE, G
    CHEMISCHE TECHNIK, 1971, 23 (4-5): : 197 - &
  • [22] EXPERIENCES GAINED IN THE OPERATION OF ANAEROBIC TREATMENT PLANTS IN GERMANY
    AUSTERMANNHAUN, U
    SEYFRIED, CF
    WATER SCIENCE AND TECHNOLOGY, 1994, 30 (12) : 415 - 424
  • [23] UNDERGROUND STORAGE STATION LESUM - EXPERIENCES IN CONSTRUCTION AND OPERATION
    LECHLER, S
    ERDOL & KOHLE ERDGAS PETROCHEMIE, 1973, 26 (11): : 669 - 669
  • [24] Open Undersea Cable Systems for Cloud Scale Operation
    Gaudette, Jamie
    Stuch, Tim
    2017 OPTICAL FIBER COMMUNICATIONS CONFERENCE AND EXHIBITION (OFC), 2017,
  • [25] Integrated operation systems for access cable networks: OPTOS
    Kokubun, T
    Abe, T
    Mitsunaga, Y
    Gencho, M
    GLOBECOM 98: IEEE GLOBECOM 1998 - CONFERENCE RECORD, VOLS 1-6: THE BRIDGE TO GLOBAL INTEGRATION, 1998, : 282 - 287
  • [26] Metro systems: Construction, operation and impacts
    Lin, Dong
    Zhou, Zhipeng
    Weng, Miaocheng
    Broere, Wout
    Cui, Jianqiang
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2024, 143
  • [27] PHOTOVOLTAIC POWER PLANTS IN SLAVONIA AND BARANJA: EXPERIENCES IN THE DESIGN AND OPERATION
    Nikolovski, Srete
    Knezevic, Goran
    Kresonja, Mario
    Gorup, Jurica
    3. MEDUNARODNI ZNANSTVENI SIMPOZIJ GOSPODARSTVO ISTOCNE HRVATSKE - VIZIJA I RAZVOJ, 2014, : 467 - 477
  • [28] First operation experiences from a 30 kV, 104 MVA HTS power cable installed in a utility substation
    Willén, D
    Hansen, F
    Däumling, M
    Rasmussen, CN
    Ostergaard, J
    Træholt, C
    Veje, E
    Tonnesen, O
    Jensen, KH
    Olsen, SK
    Rasmussen, C
    Hansen, E
    Schuppach, O
    Visler, T
    Kvorning, C
    Hansen, E
    Schuppach, O
    Visler, T
    Kvorning, S
    Schuzster, J
    Mortensen, J
    Christiansen, J
    Mikkelsen, SD
    PHYSICA C-SUPERCONDUCTIVITY AND ITS APPLICATIONS, 2002, 372 : 1571 - 1579
  • [29] Effect of Pump Operation on Headspace Air Pressure Variation in Sanitary Sewer Systems
    Qian, Yu
    Zhu, David Z.
    Yue, David
    JOURNAL OF ENVIRONMENTAL ENGINEERING, 2021, 147 (03)
  • [30] EXPERIENCES IN THE DESIGN, CONSTRUCTION AND OPERATION OF A LARGE OLEFIN PLANT FROM THE VIEWPOINT OF WORK AND OPERATIONAL SAFETY
    STILLER, J
    BENDA, E
    CHEMISCHE TECHNIK, 1983, 35 (09): : 481 - 482