Makespan computation for cyber manufacturing centre using bottleneck analysis: A re-entrant flow shop problem

被引:0
|
作者
Bareduan, Salleh Ahmad [1 ]
Hasan, Sulaiman Hj. [1 ]
机构
[1] Univ Tun Hussein Onn Malaysia, Batu Pahat 86400, Johor, Malaysia
关键词
bottleneck; cyber manufacturing; scheduling; re-entrant flow shop;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper presents the development of an alternative method for makespan computation algorithms of a re-entrant flow shop scheduling problem using bottleneck analysis. The computation is specifically intended for the cyber manufacturing centre (CMC) which is an Internet based collaborative design and manufacturing services at Universiti Tun Hussein Onn Malaysia. The CMC processes scheduling resembles a four machine permutation re-entrant flow shop with the process routing of M1,M2,M3,M4,M3,M4. It was shown that under the sequence dependent bottleneck characteristics, the makespan can be accurately determined by the algorithm developed using bottleneck analysis. In cases where the bottleneck limitation is violated, the makespan can still be accurately determined by the introduction of bottleneck correction factor.
引用
收藏
页码:1644 / 1648
页数:5
相关论文
共 50 条
  • [41] Greedy simulated annealing algorithm for solving hybrid flow shop scheduling problem with re-entrant batch processing machine
    Wu XiuLi
    Cao Zheng
    2020 CHINESE AUTOMATION CONGRESS (CAC 2020), 2020, : 4907 - 4911
  • [42] ANALYSIS OF A CONSERVATION LAW MODELING A HIGHLY RE-ENTRANT MANUFACTURING SYSTEM
    Coron, Jean-Michel
    Kawski, Matthias
    Wang, Zhiqiang
    DISCRETE AND CONTINUOUS DYNAMICAL SYSTEMS-SERIES B, 2010, 14 (04): : 1337 - 1359
  • [43] Re-entrant jet analysis of cavitating turbulent flow on a hydrofoil
    Zhang, Hongming
    Zhang, Lixiang
    STRUCTURAL ENGINEERING, VIBRATION AND AEROSPACE ENGINEERING, 2014, 482 : 375 - 380
  • [44] Performance evaluation of re-entrant manufacturing system with production loss using mean value analysis
    Kim, S
    Park, Y
    Jun, CH
    COMPUTERS & OPERATIONS RESEARCH, 2006, 33 (05) : 1308 - 1325
  • [45] Multi-objective re-entrant hybrid flow shop scheduling problem considering fuzzy processing time and delivery time
    Geng, Kaifeng
    Wu, Shaoxing
    Liu, Li
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2022, 43 (06) : 7877 - 7890
  • [46] Agent Based Resources Allocation in Job Shop with Re-entrant Features: A Benchmarking Analysis
    Savino, Matteo Mario
    Mazza, Antonio
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: COMPETITIVE MANUFACTURING FOR INNOVATIVE PRODUCTS AND SERVICES, AMPS 2012, PT I, 2013, 397 : 350 - 358
  • [47] Modeling and Simulation of a Re-entrant Manufacturing System Using Colored Petri Nets
    Gehlot, Vijay
    Nigro, Carmen
    45TH ANNUAL SIMULATION SYMPOSIUM 2012 (ANSS 2012), 2012, 44 (02): : 1 - 8
  • [48] Surgery scheduling in outpatient procedure centre with re-entrant patient flow and fuzzy service times
    Wang, Kai
    Qin, Hu
    Huang, Yun
    Luo, Mengwen
    Zhou, Lei
    Omega (United Kingdom), 2021, 102
  • [49] Design of a genetic algorithm for bi-objective flow shop scheduling problems with re-entrant jobs
    Lee, Carman K. M.
    Lin, Danping
    Ho, William
    Wu, Zhang
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 56 (9-12): : 1105 - 1113
  • [50] Design of a genetic algorithm for bi-objective flow shop scheduling problems with re-entrant jobs
    Carman K. M. Lee
    Danping Lin
    William Ho
    Zhang Wu
    The International Journal of Advanced Manufacturing Technology, 2011, 56 : 1105 - 1113