Crew scheduling of light rail transit in Hong Kong: From modeling to implementation

被引:18
|
作者
Chu, SCK
Chan, ECH
机构
[1] Univ Hong Kong, Dept Math, Hong Kong, Peoples R China
[2] Hong Kong Int Airport, Hongkong Airport Serv Ltd, Hong Kong, Peoples R China
关键词
crew scheduling; optimization modeling; heuristics;
D O I
10.1016/S0305-0548(98)00030-6
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This work concerns the problem of crew scheduling for the Hong Kong Light Rail Transit (LRT), which together with Heavy Rail Transit, makes up the two divisions of Kowloon-Canton Railway Corporation. As of early 1996, LRT operates eight routes, two train depots and 57 stations on its operational network. It is rapidly expanding on routes, capacities and territorial coverage, hence pressing needs for timely constructions of crew schedules whenever passenger demand variations necessitate modifications in train timetables, typically every 3-4 months. Computer-assisted manual solutions from old software can take up to 1 month of painstaking work. Our project aims at automating this complex schedule construction, adopting a novel optimization modeling approach amenable for decomposition into separate solution-stages by network and heuristics algorithms. The entire crew schedule can be constructed iteratively in less than half an hour on a PC. The implementation runs as a decision support tool, with contributions of an overwhelming reduction in human effort in crew schedule construction and a feasible and better (higher productivity rate) schedule, with possible further manual improvements that can be made. (C) 1998 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:887 / 894
页数:8
相关论文
共 50 条
  • [42] Modeling riders' behavioral responses to real-time information at light rail transit stations
    Bai, Yuan
    Kattan, Una
    Transportation Research Record, 2014, 2412 : 82 - 92
  • [43] Modeling the Influence of the Light Rail Transit System on Traffic Operational Performance before and after It Is in Operation
    Kodupuganti, Swapneel R.
    Pulugurtha, Srinivas S.
    INTERNATIONAL CONFERENCE ON TRANSPORTATION AND DEVELOPMENT 2021: TRANSPORTATION OPERATIONS, TECHNOLOGIES, AND SAFETY, 2021, : 491 - 501
  • [44] CASE HISTORY Stray Current Interference from a Light Rail Transit System
    Kirkpatrick, Earl L.
    MATERIALS PERFORMANCE, 2013, 52 (01) : 32 - 35
  • [45] Analysis of low frequency vibrations from an underground light rail transit system
    Ellis, HL
    Mikhail, RA
    Fischer, GR
    Godlewski, PM
    NORTH AMERICAN TUNNELING 2000: UNDERGROUND CONSTRUCTION: THE REVOLUTION CONTINUES, 2000, : 403 - 410
  • [46] From Rapid Transit and Light Rail to Trains and Trams: Exploring Sydney, Australia's Expansive Public Transit Initiatives PART TWO: SYDNEY'S LIGHT RAIL EXPANSION
    Birdsall, Michelle
    ITE JOURNAL-INSTITUTE OF TRANSPORTATION ENGINEERS, 2015, 85 (12): : 28 - 31
  • [47] Transit-oriented development on greenfield versus infill sites: Some lessons from Hong Kong
    Loo, Becky P. Y.
    Cheng, Amy H. T.
    Nichols, Samantha L.
    LANDSCAPE AND URBAN PLANNING, 2017, 167 : 37 - 48
  • [48] Understanding the Implementation of Antimicrobial Policies: Lessons from the Hong Kong Strategy and Action Plan
    Song, Mingqi
    Deng, Ziru
    Chan, Olivia
    Grepin, Karen Ann
    ANTIBIOTICS-BASEL, 2022, 11 (05):
  • [49] Dynamic (Transient) Modeling and Study of Light Rail Transit System In EMTP, including loading and unloading effect
    Boloorchi, Mehrdad
    Rostami, Mehrdad
    2019 IEEE TRANSPORTATION ELECTRIFICATION CONFERENCE AND EXPO (ITEC), 2019,
  • [50] Assessment on the Current and Future Performance of Addis Ababa Light Rail Transit Service Using Mathematical Modeling
    Debebe, Getu
    Asteray, Belachew
    ADVANCES IN CIVIL ENGINEERING, 2022, 2022