An approximation algorithm for proportionate scheduling in the two-stage hybrid flow shop

被引:3
|
作者
Dong, Jianming [1 ]
Jiang, Yiwei [1 ]
Zhang, An [2 ]
Hu, Jueliang [1 ]
Luo, Hui [1 ]
机构
[1] Zhejiang Sci Tech Univ, Dept Math, Hangzhou 310018, Zhejiang, Peoples R China
[2] Hangzhou Dianzi Univ, Inst Operat Res & Cybernet, Hangzhou 310018, Zhejiang, Peoples R China
基金
中国国家自然科学基金;
关键词
Scheduling; Two-stage proportionate flow shop; Approximation algorithm; Worst-case analysis; MULTIPROCESSOR OPEN; MINIMIZE; FLOWSHOPS; SYSTEMS;
D O I
10.1016/j.ipl.2014.11.014
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In the hybrid flow shop, jobs are subjected to process through stages in series as in the classical flow shop, while each stage contains one or more identical machines. This paper mainly studies the scheduling problem in the two-stage hybrid flow shop, namely the proportionate scheduling. In such problem, it is assumed that each job has the same processing time in different stages. The objective of minimizing the makespan is considered. If there are two machines in the first stage and m machines in the second, then an approximation algorithm with worst case ratio no more than 3/2 is provided. If each stage consists of only two machines, we show that the tight bound of our algorithm can be reduced to 4/3. (C) 2014 Elsevier B.V. All rights reserved.
引用
收藏
页码:475 / 480
页数:6
相关论文
共 50 条
  • [31] Integration of the A2C Algorithm for Production Scheduling in a Two-Stage Hybrid Flow Shop Environment
    Gerpott, Falk T.
    Lang, Sebastian
    Reggelin, Tobias
    Zadek, Hartmut
    Chaopaisarn, Poti
    Ramingwong, Sakgasem
    3RD INTERNATIONAL CONFERENCE ON INDUSTRY 4.0 AND SMART MANUFACTURING, 2022, 200 : 585 - 594
  • [32] Co-Evolutionary Algorithm for Two-Stage Hybrid Flow Shop Scheduling Problem with Suspension Shifts
    Huang, Zhijie
    Huang, Lin
    Li, Debiao
    MATHEMATICS, 2024, 12 (16)
  • [33] A branch-and-bound algorithm for two-stage no-wait hybrid flow-shop scheduling
    Wang, Shijin
    Liu, Ming
    Chu, Chengbin
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (04) : 1143 - 1167
  • [34] Two-stage open-shop scheduling with a two-machine flow shop as a stage: approximation algorithms and empirical experiments
    Dong, Jianming
    Chang, Joshua
    Su, Bing
    Hu, Jueliang
    Lin, Guohui
    JOURNAL OF SCHEDULING, 2020, 23 (05) : 595 - 608
  • [35] Two-stage open-shop scheduling with a two-machine flow shop as a stage: approximation algorithms and empirical experiments
    Jianming Dong
    Joshua Chang
    Bing Su
    Jueliang Hu
    Guohui Lin
    Journal of Scheduling, 2020, 23 : 595 - 608
  • [36] Automatic Design of Efficient Heuristics for Two-Stage Hybrid Flow Shop Scheduling
    Liu, Lingxuan
    Shi, Leyuan
    SYMMETRY-BASEL, 2022, 14 (04):
  • [37] Two-stage hybrid flow shop with recirculation
    Boudhar, Mourad
    Meziani, Nadjat
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2010, 17 (02) : 239 - 255
  • [38] Proportionate flexible flow shop scheduling via a hybrid constructive genetic algorithm
    Shiau, Der-Fang
    Cheng, Shu-Chen
    Huang, Yueh-Min
    EXPERT SYSTEMS WITH APPLICATIONS, 2008, 34 (02) : 1133 - 1143
  • [39] Outsourcing and production scheduling for a two-stage flow shop
    Qi, Xiangtong
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2011, 129 (01) : 43 - 50
  • [40] Two-stage flow shop scheduling with dedicated machines
    Lin, Bertrand M. T.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (04) : 1094 - 1097