A fuzzy evidential reasoning-based approach for risk assessment of deep foundation pit

被引:35
|
作者
Wei, Daojiang [1 ]
Xu, Dongsheng [2 ]
Zhang, Yong [3 ]
机构
[1] Hubei Univ Art & Sci, Sch Civil Engn & Architecture, Xiangyang 441053, Hubei, Peoples R China
[2] Univ Salford, Salford Business Sch, Salford, Lancs, England
[3] Xian Univ Architecture & Technol, Sch Civil Engn, Xian 710055, Shaanxi, Peoples R China
关键词
Deep foundation pit; Risk assessment; Fuzzy set theory; Evidential reasoning; Fuzzy analytical hierarchy process; FAILURE MODE; HIERARCHY PROCESS; DECISION-SUPPORT; CONSTRUCTION; MANAGEMENT; INFORMATION; PROJECT; SYSTEM;
D O I
10.1016/j.tust.2019.103232
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Traditional risk assessment methods, such as the probabilistic methods, are not effectively used in the construction works of a deep foundation pit (DFP) when data set collected are incomplete or vague input takes place. A new method based on fuzzy evidential reasoning approach is proposed in this paper to assess the overall risk level of a DFP construction project. Firstly, the method defines risks as the products of occurrence likelihood multiplying consequence severity, which is further depicted by trapezoidal fuzzy numbers. Thereafter, the fuzzy analytical hierarchy process is adopted to calculate the weighs of different hazardous events that may occur in a DFP construction project. The overall risk level of a DFP project therefore could be achieved through aggregating the risk level of all hazardous events based on evidential reasoning algorithm. However, due to the existence of intersections among more than two continuous fuzzy evaluation grades rather than between two adjacent grades, the prevailing aggregation method is not suitable any more. So, a new aggregated probability mass along with the reassigning method in relation to the degree of belief belonging to the fuzzy intersection of two grades is thus put forward in this paper, as a result to make the evidential reasoning possible. A case study on risk assessment of the DFP of underground traffic project of Zhengzhou comprehensive transportation hub in China is introduced to illustrate the application of the proposed method. The result indicates that the overall risk level of a DFP project could be assessed effectively under the scenario that more than two continuous fuzzy evaluation grades intersect rather than only two adjacent grades. Moreover, comparing with the traditional methods, the result obtained in the case study by using the proposed method seems to be more reasonable.
引用
收藏
页数:16
相关论文
共 50 条
  • [21] Modeling on risk analysis of emergency based on fuzzy evidential reasoning
    Qiao, Xiao-Jiao
    Li, Yong-Jian
    Chang, Bo
    Wang, Xun-Qing
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2015, 35 (10): : 2657 - 2666
  • [22] Hybrid fusion approach based on fuzzy feature and evidential reasoning
    Yuan, XH
    Zhang, J
    Buckles, BP
    PROCEEDINGS OF THE 12TH IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1 AND 2, 2003, : 961 - 965
  • [23] Study on fuzzy case based reasoning-based approach for mechanical equipment selection
    Ren, Zhaohui
    Song, Naihui
    Li, Xiaopeng
    Wen, Bangchun
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON MECHANICAL ENGINEERING AND MECHANICS 2007, VOLS 1 AND 2, 2007, : 455 - 457
  • [24] Defect-Based Condition Assessment of Concrete Bridges Fuzzy Hierarchical Evidential Reasoning Approach
    Moufti, Sami A.
    Zayed, Tarek
    Abu Dabous, Saleh
    TRANSPORTATION RESEARCH RECORD, 2014, (2431) : 88 - 96
  • [25] Evidential Reasoning Based on the Fuzzy Beliefs
    Gao, Jian
    Yan, Jingjing
    Duanmu, Zuyun
    PROCEEDINGS OF 2010 3RD IEEE INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND INFORMATION TECHNOLOGY (ICCSIT 2010), VOL 6, 2010, : 103 - 107
  • [26] ERIUE: Evidential reasoning-based influential users evaluation in social networks
    Wen, Tao
    Chen, Yu-wang
    Syed, Tahir Abbas
    Wu, Ting
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2024, 122
  • [27] Maximum Likelihood Evidential Reasoning-Based Hierarchical Inference with Incomplete Data
    Liu, Xi
    Sachan, Swati
    Yang, Jian-Bo
    Xu, Dong-Ling
    2019 25TH IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND COMPUTING (ICAC), 2019, : 42 - 47
  • [28] Construction risk identification and assessment of a deep foundation pit in Shanghai
    Shanghai Jianke Project Management Co., Ltd., Shanghai 200032, China
    Yantu Gongcheng Xuebao, 2006, SUPPL. (1912-1915):
  • [29] An Evidential Reasoning-Based CREAM to Human Reliability Analysis in Maritime Accident Process
    Wu, Bing
    Yan, Xinping
    Wang, Yang
    Soares, C. Guedes
    RISK ANALYSIS, 2017, 37 (10) : 1936 - 1957
  • [30] Fuzzy rule-based evidential reasoning approach for safety analysis
    Liu, J
    Yang, JB
    Wang, J
    Sii, HS
    Wang, YM
    INTERNATIONAL JOURNAL OF GENERAL SYSTEMS, 2004, 33 (2-3) : 183 - 204