Task network-based project dynamic scheduling and schedule coordination

被引:12
|
作者
Hao, Qi [1 ]
Shen, Weiming [1 ]
Xue, Yunjiao [1 ]
Wang, Shuying [1 ]
机构
[1] Natl Res Council Canada, Ctr Comp Assisted Construct Technol, London, ON N6G 4X8, Canada
关键词
Resource-constrained project scheduling problem (RCPSP); Dynamic scheduling; Multi-project scheduling; Schedule coordination; Aircraft maintenance management; RESOURCE; CLASSIFICATION; HEURISTICS;
D O I
10.1016/j.aei.2010.07.001
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The resource-constrained project scheduling problem (RCPSP) is an extensively explored area The existing RCPSP solutions tend to focus on single project scheduling problems without practical supports to address complex constraints, dynamic environments, and multi-project schedule coordination. This paper proposes a dynamic project scheduling algorithm based on partial task network heuristics. This algorithm takes time constraints. resource constraints, and particularly the changing task execution status into consideration To coordinate conflicting schedules of multiple projects, we proposed an interactive decision support process and developed new algorithms for conflict detection, conflict resolution, and impact analysis The proposed algorithms have been fully implemented and tested in a web-based aircraft maintenance management system and are being applied in construction for project scheduling and facilities maintenance management. Crown Copyright (C) 2010 Published by Elsevier Ltd All rights reserved.
引用
收藏
页码:417 / 427
页数:11
相关论文
共 50 条
  • [41] A hybrid Backpropagation network-based scheduling knowledge acquisition algorithm
    Wang, Weida
    Liu, Wenjian
    2006 INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND SECURITY, PTS 1 AND 2, PROCEEDINGS, 2006, : 151 - 154
  • [42] A complex network-based approach for job scheduling in grid environments
    Ishii, Renato P.
    de Mello, Rodrigo F.
    Yang, Laurence T.
    HIGH PERFORMANCE COMPUTING AND COMMUNICATIONS, PROCEEDINGS, 2007, 4782 : 204 - +
  • [43] A network-based solution for TCP enhancement over opportunistic scheduling
    Wu, Y
    Niu, ZS
    Zhu, JF
    ICC 2005: IEEE INTERNATIONAL CONFERENCE ON COMMUNICATIONS, VOLS 1-5, 2005, : 3560 - 3564
  • [44] A network-based solution for TCP in wireless systems with opportunistic scheduling
    Wu, Y
    Niu, ZS
    Zheng, JL
    2004 IEEE 15TH INTERNATIONAL SYMPOSIUM ON PERSONAL, INDOOR AND MOBILE RADIO COMMUNICATIONS, VOLS 1-4, PROCEEDINGS, 2004, : 1241 - 1245
  • [45] Scheduling directed a-cyclic task graphs on heterogeneous network of workstations to minimize schedule length
    Baskiyar, S
    SaiRanga, PC
    2003 INTERNATIONAL CONFERENCE ON PARALLEL PROCESSING WORKSHOPS, PROCEEDINGS, 2003, : 97 - 103
  • [46] Network-based simulation approach for scheduling trains on rail networks
    Li, Ke Ping
    Gao, Zi You
    INTERNATIONAL JOURNAL OF MODERN PHYSICS C, 2006, 17 (09): : 1349 - 1358
  • [47] A practical test scheduling using network-based TAM in network on chip architecture
    Ahn, JH
    Moon, BI
    Kang, SH
    ADVANCES IN COMPUTER SYSTEMS ARCHITECTURE, PROCEEDINGS, 2005, 3740 : 614 - 624
  • [48] Network-based dynamic dispatching rule generation mechanism for real-time production scheduling problems with dynamic job arrivals
    Zhuang, Zilong
    Li, Yue
    Sun, Yanning
    Qin, Wei
    Sun, Zhao-Hui
    ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2022, 73
  • [49] Application of genetic algorithm for scheduling and schedule coordination problems
    Shrivastava, P
    Dhingra, SL
    Gundaliya, PJ
    JOURNAL OF ADVANCED TRANSPORTATION, 2002, 36 (01) : 23 - 41
  • [50] Network-based dynamic dispatching rule generation mechanism for real-time production scheduling problems with dynamic job arrivals
    Zhuang, Zilong
    Li, Yue
    Sun, Yanning
    Qin, Wei
    Sun, Zhao-Hui
    Robotics and Computer-Integrated Manufacturing, 2022, 73