The Balancing Control of Garments Production Assembly Line

被引:0
|
作者
Lv, Ya-Chi [1 ]
Liang, Su-Zhen [2 ]
机构
[1] Minjiang Univ, Straits Coll, 200 Xiyuan Gong Rd, Fuzhou 350108, Fujian, Peoples R China
[2] Minjiang Univ, Fash & Art Engn Coll, 200 Xiyuan Gong Rd, Fuzhou 350108, Fujian, Peoples R China
关键词
Production Assembly Line; Loads Equalization; Production Process;
D O I
暂无
中图分类号
TB3 [工程材料学]; TS1 [纺织工业、染整工业];
学科分类号
0805 ; 080502 ; 0821 ;
摘要
With the opening of the market economy in China, the clothing industry has to adjust and level to the industrial upgrading stage. Currently it has been undergoing a transition period from OEM to ODM, where they were able to produce garments with multispecies and small quantities. Enterprises should accordingly improve the management level of clothing production, especially the management of garment production assembly line. Enterprises also must establish a reasonable and high effective management system. The fundamental principle of the balancing management of garment production assembly line is introduced, then the practical operation process and method is explained with examples, while pointing out the significance of establishing a balanced production assembly line.
引用
收藏
页码:668 / 672
页数:5
相关论文
共 50 条
  • [41] A GOAL APPROACH TO ASSEMBLY LINE BALANCING
    DECKRO, RF
    RANGACHARI, S
    COMPUTERS & OPERATIONS RESEARCH, 1990, 17 (05) : 509 - 521
  • [42] Assembly line balancing with station paralleling
    Ege, Yunus
    Azizoglu, Meral
    Ozdemirel, Nur E.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 57 (04) : 1218 - 1225
  • [43] Developing an assembly line for mixed models - Line balancing
    Rechnergestützte Austaktung einer Mixed-Model Line: Der Weg zur optimalen Austaktung
    1600, VDI Fachmedien GmBH & Co. KG (103):
  • [44] CONWIP based control of a lamp assembly production line
    W. H. Ip
    Min Huang
    K. L. Yung
    Dingwei Wang
    Xingwei Wang
    Journal of Intelligent Manufacturing, 2007, 18 : 261 - 271
  • [45] CONWIP based control of a lamp assembly production line
    Ip, W. H.
    Huang, Min
    Yung, K. L.
    Wang, Dingwei
    Wang, Xingwei
    JOURNAL OF INTELLIGENT MANUFACTURING, 2007, 18 (02) : 261 - 271
  • [46] Improving Assembly Line Balancing Using Moodie Young Methods on Dump Truck Production
    Syahputri, K.
    Sari, R. M.
    Anizar
    Rizkya, I.
    Leviza, J.
    Siregar, I.
    2ND ANNUAL APPLIED SCIENCE AND ENGINEERING CONFERENCE (AASEC 2017), 2018, 288
  • [47] A Mathematical Model for Two-sided Assembly Line Balancing Problem in Motorcycle Production
    Mohammed, Fatini Dalili
    Juin, Tan Wan
    Zakaria, Mohd Zakimi
    Ramli, Mohammad Fadzli
    2018 IEEE 5TH INTERNATIONAL CONFERENCE ON SMART INSTRUMENTATION, MEASUREMENT AND APPLICATION (ICSIMA), 2018,
  • [48] Models for Optimization of Total Assembly Time and Assembly Line Balancing
    Kleiza, V.
    Tilindis, J.
    INTELLIGENT TECHNOLOGIES IN LOGISTICS AND MECHATRONICS SYSTEMS: ITEMS 2009, 2009, : 100 - 103
  • [49] An efficient heuristic for the U-line assembly line balancing problem in the just-in-time production environment
    Chiang, WC
    Kouvelis, P
    Chen, CHJ
    DECISION SCIENCES INSTITUTE, 1997 ANNUAL MEETING, PROCEEDINGS, VOLS 1-3, 1997, : 1126 - 1128
  • [50] Line balancing of PCB assembly line using immune algorithms
    Khoo, LP
    Alisantoso, D
    ENGINEERING WITH COMPUTERS, 2003, 19 (2-3) : 92 - 100