Improving handoff communication from hospital to home: the development, implementation and evaluation of a personalized patient discharge letter

被引:33
|
作者
Buurman, Bianca M. [1 ]
Verhaegh, Kim J. [1 ]
Smeulers, Marian [2 ]
Vermeulen, Hester [2 ]
Geerlings, Suzanne E. [3 ]
Smorenburg, Susanne [4 ]
de Rooij, Sophia E. [1 ]
机构
[1] Acad Med Ctr, Geriatr Med Sect, Dept Internal Med, F4-135,POB 22600, NL-1100 DD Amsterdam, Netherlands
[2] Acad Med Ctr, Dept Qual Assurance & Proc Innovat, Amsterdam, Netherlands
[3] Acad Med Ctr, Infect Dis Sect, Dept Internal Med, Amsterdam, Netherlands
[4] Cordaan, Dept Qual, Amsterdam, Netherlands
关键词
patient discharge; handover; patient-centered care; patient satisfaction; patient-centered communication; PRIMARY-CARE; SELF-MANAGEMENT; RISK-FACTORS; QUALITY; INFORMATION; TRANSITIONS; SAFETY; OLDER;
D O I
10.1093/intqhc/mzw046
中图分类号
R19 [保健组织与事业(卫生事业管理)];
学科分类号
摘要
Objective: To develop, implement and evaluate a personalized patient discharge letter (PPDL) to improve the quality of handoff communication from hospital to home. Design: From the end of 2006-09 we conducted a quality improvement project; consisting of a before-after evaluation design, and a process evaluation. Setting: Four general internal medicine wards, in a 1024-bed teaching hospital in Amsterdam, the Netherlands. Participants: All consecutive patients of 18 years and older, admitted for at least 48 h. Interventions: A PPDL, a plain language handoff communication tool provided to the patient at hospital discharge. Main Outcome Measures: Verbal and written information provision at discharge, feasibility of integrating the PPDL into daily practice, pass rates of PPDLs provided at discharge. Results: A total of 141 patients participated in the before-after evaluation study. The results from the first phase of quality improvement showed that providing patient with a PPDL increased the number of patients receiving verbal and written information at discharge. Patient satisfaction with the PPDL was 7.3. The level of implementation was low(30%). In the second phase, the level of implementation improved because of incorporating the PPDL into the electronic patient record (EPR) and professional education. An average of 57% of the discharged patients received the PPDL upon discharge. The number of discharge conversations also increased. Conclusion: Patients and professionals rated the PPDL positively. Key success factors for implementation were: education of interns, residents and staff, standardization of the content of the PPDL, integrating the PPDL into the electronic medical record and hospital-wide policy.
引用
收藏
页码:384 / 390
页数:7
相关论文
共 50 条
  • [21] Development of the Uncertainty Communication Checklist: A Patient-Centered Approach to Patient Discharge From the Emergency Department
    Rising, Kristin L.
    Powell, Rhea E.
    Cameron, Kenzie A.
    Salzman, David H.
    Papanagnou, Dimitrios
    Doty, Amanda M. B.
    Latimer, Lori
    Piserchia, Katherine
    McGaghie, William C.
    McCarthy, Danielle M.
    ACADEMIC MEDICINE, 2020, 95 (07) : 1026 - 1034
  • [22] Implementation of an in-reach rehabilitation program can increase the rate of discharge home from acute hospital care
    Wu, Jane
    Shiner, Christine T.
    Faux, Steven G.
    Watanabe, Yuriko
    AUSTRALIAN HEALTH REVIEW, 2023, 47 (05) : 619 - 625
  • [23] Patient engagement in the development of best practices for transitions from hospital to home: a scoping review
    Zhao, Grace
    Kennedy, Carol
    Mabaya, Gracia
    Okrainec, Karen
    Kiran, Tara
    BMJ OPEN, 2019, 9 (08):
  • [24] Improving Communication About Resuscitation Preference for Patients Discharged from Hospital to Nursing Home: A Quality Improvement Project
    Haynes, Christine A.
    Dashiell-Earp, Cody N.
    Wenger, Neil S.
    Simon, Wendy M.
    Skootsky, Samuel A.
    Clarke, Robin
    Watts, Frances A.
    Walling, Anne M.
    JOURNAL OF PALLIATIVE MEDICINE, 2019, 22 (05) : 557 - 560
  • [25] Improving transitional care communication for older Australians from hospital to home: Co-design of the TRANSITION tool
    Allen, Jacqueline
    Hutchinson, Alison M.
    Brown, Rhonda
    Livingston, Patricia M.
    HEALTH & SOCIAL CARE IN THE COMMUNITY, 2022, 30 (06) : E4223 - E4238
  • [26] Managing the Transition From Hospital to Home After Stroke: A Patient and Care Partner Guide to Facilitate Discharge Planning
    Osborne, Candice
    Trammell, Molly
    Vega, Marlene
    ARCHIVES OF PHYSICAL MEDICINE AND REHABILITATION, 2023, 104 (01): : 161 - 164
  • [27] PLANNED EARLY DISCHARGE FROM HOSPITAL .C. PRACTICAL ASPECTS OF NURSING ACUTELY ILL PATIENT AT HOME
    MCLEOD, MH
    ROYAL SOCIETY OF HEALTH JOURNAL, 1970, 90 (02): : 109 - 111
  • [28] Implementation of a frailty intervention in the transition from hospital to home: a realist process evaluation protocol for the FORTRESS trial
    Manuel, Kisani
    Block, Heather
    Crotty, Maria
    Harvey, Gillian
    Kurrle, Susan E.
    Cameron, Ian
    Lockwood, Keri
    Sherrington, Catherine
    Pond, Dimity
    Nguyen, Tuan A.
    Laver, Kate
    BMJ OPEN, 2023, 13 (06):
  • [29] Quality of Hospital Communication and Patient Preparation for Home Health Care: Results From a Statewide Survey of Home Health Care Nurses and Staff
    Jones, Christine D.
    Jones, Jacqueline
    Bowles, Kathryn H.
    Flynn, Linda
    Masoudi, Frederick A.
    Coleman, Eric A.
    Levy, Cari
    Boxer, Rebecca S.
    JOURNAL OF THE AMERICAN MEDICAL DIRECTORS ASSOCIATION, 2019, 20 (04) : 487 - 491
  • [30] TRANSITIONING FROM HOSPITAL TO HOME: DEVELOPMENT OF AN INNOVATIVE CARE MODEL FOR THE HIGH RISK CARDIAC PATIENT
    Brubacher, L.
    Belford, L.
    Linghorne, M.
    CANADIAN JOURNAL OF CARDIOLOGY, 2010, 26 : 155D - 155D