Phosphorus removal performance and biological dephosphorization process in treating reclaimed water by Integrated Vertical-flow Constructed Wetlands (IVCWs)

被引:78
|
作者
Du, Lu [1 ,2 ]
Chen, Qianru [1 ,2 ]
Liu, Panpan [2 ,3 ]
Zhang, Xia [1 ,2 ]
Wang, Huihui [2 ,3 ]
Zhou, Qiaohong [2 ]
Xu, Dong [2 ]
Wu, Zhenbin [2 ]
机构
[1] Wuhan Univ Technol, Coll Resources & Environm Engn, Wuhan 430070, Hubei, Peoples R China
[2] Chinese Acad Sci, Inst Hydrobiol, State Key Lab Freshwater Ecol & Biotechnol, Wuhan 430072, Hubei, Peoples R China
[3] Univ Chinese Acad Sci, Beijing 100039, Peoples R China
关键词
Integrated Vertical-flow Constructed; Wetlands (IVCWs); Phosphate removal; Biological dephosphorization; Enzyme activity; Microbial community; ACTIVATED-SLUDGE; NITROGEN REMOVAL; WASTE-WATER; ACCUMULATING BACTERIA; PHOSPHATE REMOVAL; EFFICIENCY; TEMPERATURE; PLANTS; IDENTIFICATION; COMMUNITIES;
D O I
10.1016/j.biortech.2017.06.092
中图分类号
S2 [农业工程];
学科分类号
0828 ;
摘要
Phosphorous removal in adsorption had been extensively researched; however, the biological dephosphorization process and optimum operating parameters have not been discussed or quantified in Integrated Vertical-flow Constructed Wetlands (IVCWs). In this study, IVCWs planted with different plants were employed to evaluate total phosphorus (TP) treatment performance under different hydraulic retention times (HRTs), in summer and autumn. The results showed that the systems planted with Canna generalis showed the highest TP removal efficiency (77%) under a three-day HRT in autumn. The activities of exopolyphosphatase (PPX) and polyphosphate kinase (PPK) were determined, and it was found that PPK activity was seasonably variable and had been more active in autumn than that in summer (p < 0.05). Highly significant correlation was revealed between PPK activity and TP removal efficiency (p < 0.05). The 16S rDNA high-throughput sequencing results indicated that Pseudomonas genus might be the main participant in phosphorus aerobic biological adsorption in IVCWs. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:204 / 211
页数:8
相关论文
共 50 条
  • [41] Comparison of performance of two large-scale vertical-flow constructed wetlands treating wastewater treatment plant tail-water: Contaminants removal and associated microbial community
    Zhu, Tongdou
    Gao, Jingqing
    Huang, Zhenzhen
    Shang, Na
    Gao, Jianlei
    Zhang, Jinliang
    Cai, Ming
    JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2021, 278
  • [42] Plasterboard sheet applied in vertical-flow constructed wetlands: Nutrients removal, microbial diversity, and mechanisms
    Souza, Adelania de Oliveira
    Bernardelli, Jossy Karla Brasil
    Silva, Lucas de Carvalho
    Perretto, Felipe
    Nagalli, Andre
    Mymrin, Vsevolod
    Passig, Fernando Hermes
    de Carvalho, Karina Querne
    JOURNAL OF WATER PROCESS ENGINEERING, 2023, 53
  • [43] Removal of total nitrogen by Cyperus alternifolius from wastewaters in simulated vertical-flow constructed wetlands
    Cui, Li-Hua
    Ouyang, Ying
    Chen, Yin
    Zhu, Xi-Zhen
    Zhu, Wen-Ling
    ECOLOGICAL ENGINEERING, 2009, 35 (08) : 1271 - 1274
  • [44] Studies on the reaction kinetics and water flow pattern of the integrated vertical-flow constructed wetland
    Fu, G.
    Wu, Z.
    Ren, M.
    He, F.
    Cheng, S.
    Pressl, A.
    Perfler, R.
    Zhongguo Huanjing Kexue/China Environmental Science, 2001, 21 (06): : 535 - 539
  • [45] Impact of Water Quality Parameters on the Clogging of Vertical-Flow Constructed Wetlands Treating Urban Wastewater (vol 224, 1488, 2013)
    Sani, Abdulkadir
    Scholz, Miklas
    Babatunde, Akintunde
    Wang, Yu
    WATER AIR AND SOIL POLLUTION, 2013, 224 (09):
  • [46] Comparative evaluations of organic matters and nitrogen removal capacities of integrated vertical-flow constructed wetlands: Domestic and nitrified wastewater treatment
    Chang, Jun J.
    Liang, Kang
    Wu, Su Q.
    Zhang, Sheng H.
    Liang, Wei
    JOURNAL OF ENVIRONMENTAL SCIENCE AND HEALTH PART A-TOXIC/HAZARDOUS SUBSTANCES & ENVIRONMENTAL ENGINEERING, 2015, 50 (07): : 757 - 766
  • [47] Mechanisms of Phosphorus Removal by Modified Zeolites Substrates Coated with Zn-LDHs in Laboratory-scale Vertical-flow Constructed Wetlands
    Zhang X.-L.
    Huang H.-L.
    Guo L.
    Chen Q.-Z.
    Ruan C.-Y.
    Leng Y.-J.
    Huanjing Kexue/Environmental Science, 2023, 37 (08): : 3058 - 3066
  • [48] Treatment performance of integrated vertical-flow constructed wetland plots for domestic wastewater
    Chang, Jun-jun
    Wu, Su-qing
    Dai, Yan-ran
    Liang, Wei
    Wu, Zhen-bin
    ECOLOGICAL ENGINEERING, 2012, 44 : 152 - 159
  • [49] Effects of plant on denitrification pathways in integrated vertical-flow constructed wetland treating swine wastewater
    Du, Lu
    Zhao, Yuqing
    Wang, Chuan
    Wu, Zhenbin
    Zhou, Qiaohong
    ECOTOXICOLOGY AND ENVIRONMENTAL SAFETY, 2020, 201
  • [50] Removal of nitrogen from low pollution water by long-term operation of an integrated vertical-flow constructed wetland: Performance and mechanism
    Liu, Ying
    Liu, Xiaohui
    Li, Ke
    Lu, Shaoyong
    Guo, Xiaochun
    Zhang, Jian
    Xi, Beidou
    SCIENCE OF THE TOTAL ENVIRONMENT, 2019, 652 : 977 - 988