Exploring Symmetry in a Short-Term Hydro Scheduling Problem: The Case of the Santo Antonio Hydro Plant

被引:8
|
作者
Brito, Brunno H. [1 ,2 ]
Finardi, Erlon C. [3 ,4 ]
Takigawa, Fabricio Y. K. [5 ]
Pereira, Airton, I [6 ]
Gosmann, Rodrigo P. [6 ]
Weiss, Leonardo A. [6 ]
Fernandes, Argemiro [7 ]
Morais, Douglas T. S. de Assis [7 ]
机构
[1] Fed Inst Tocantins, Articulated Teaching Nucleus Control & Ind Proc, BR-77020450 Palmas, Brazil
[2] Univ Fed Santa Catarina, Dept Elect Engn, BR-88040900 Florianopolis, SC, Brazil
[3] Univ Fed Santa Catarina, Dept Elect & Elect Engn, BR-88040900 Florianopolis, SC, Brazil
[4] Inst Engn Syst & Comp Res & Dev Brazil, BR-11055300 Santos, SP, Brazil
[5] Fed Inst Santa Catarina, Dept Elect Engn, BR-88020300 Florianopolis, SC, Brazil
[6] REIVAX Automat & Control, Dept Res & Amp Dev, BR-88030904 Florianopolis, SC, Brazil
[7] Santo Antonio Energia, Dept Plant Operat, BR-76820136 Porto Velho, Brazil
关键词
UNIT COMMITMENT PROBLEM; GENERATION; DISPATCH; SYSTEM; MODEL;
D O I
10.1061/(ASCE)WR.1943-5452.0001495
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Santo Antonio is the fifth largest hydro plant in Brazil. Due to the environmental constraints, the plant follows a run-of-river operation and, to handle inflow variability, possesses the 50 most oversized bulb generating units (GUs) in the world. These issues render a challenging short-term hydro scheduling problem (STHS), where the critical aspect is modeling the hydropower function (HPF). In this context, this article proposes a two-step strategy based on mixed-integer linear programming (MILP) to solve the STHS, that: (1) explores the symmetry related to the identical GUs by applying a binary expansion to find which units will be active, and (2) obtain the optimal load distribution by linearizing a series of nonlinear problems. In both steps, the HPF is linearized using the logarithmic aggregated convex combination (LACC) model. The symmetry exploration based on the binary expansion is new in the context of the STHS. The experiments show that the proposed strategy yields equal solutions to those obtained by an individual-LACC approach while providing, on average, a 74% reduction in computational time. (C) 2021 American Society of Civil Engineers.
引用
收藏
页数:12
相关论文
共 50 条
  • [31] MILP Based Robust Short-Term Scheduling for Wind-Thermal-Hydro Power System With Pumped Hydro Energy Storage
    Xia, Pei
    Deng, Changhong
    Chen, Yahong
    Yao, Weiwei
    IEEE ACCESS, 2019, 7 : 30261 - 30275
  • [32] A NETWORK FLOW MODEL FOR SHORT-TERM HYDRO-DOMINATED HYDROTHERMAL SCHEDULING PROBLEMS
    FRANCO, PEC
    CARVALHO, MF
    SOARES, S
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1994, 9 (02) : 1016 - 1022
  • [33] Algorithmic Development and Industrial Applications of Short-term Hydro Scheduling in the Nordic Power Market
    Skjelbred, Hans Ivar
    Kong, Jiehong
    Aasgard, Ellen Krohn
    Belsnes, Michael Martin
    Fosso, Olav Bjarte
    2022 IEEE PES 14TH ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE, APPEEC, 2022,
  • [34] Short-Term Hydro-Thermal-Wind Scheduling Using Salp Swarm Algorithm
    Das, Sujay
    Bhattacharya, Aniruddha
    Chakraborty, Ajoy Kumar
    2018 6TH INTERNATIONAL ELECTRICAL ENGINEERING CONGRESS (IEECON), 2018,
  • [35] Experiences with mixed integer linear programming based approaches on short-term hydro scheduling
    Chang, GW
    Aganagic, M
    Waight, JG
    Medina, J
    Burton, T
    Reeves, S
    Christoforidis, M
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2001, 16 (04) : 743 - 749
  • [36] A hierarchical model in short-term hydro scheduling with unit commitment and head-dependency
    Cheng, Xianliang
    Feng, Suzhen
    Zheng, Hao
    Wang, Jinwen
    Liu, Shuangquan
    ENERGY, 2022, 251
  • [37] Short-term hydro-thermal scheduling using particle swarm optimization method
    Yu, Binghui
    Yuan, Xiaohui
    Wang, Jinwen
    ENERGY CONVERSION AND MANAGEMENT, 2007, 48 (07) : 1902 - 1908
  • [38] Short-term scheduling of a hydro-thermal system using linear programming technique
    Mwakabuta, N
    Kyaruzi, A
    IPEC 2003: Proceedings of the 6th International Power Engineering Conference, Vols 1 and 2, 2003, : 698 - 703
  • [39] Nonlinear optimization method for short-term hydro scheduling considering head-dependency
    Catalao, J. P. S.
    Mariano, S. J. P. S.
    Mendes, V. M. F.
    Ferreira, L. A. F. M.
    EUROPEAN TRANSACTIONS ON ELECTRICAL POWER, 2010, 20 (02): : 172 - 183
  • [40] A Study on Short-Term Hydro-thermal Scheduling Based on Whole Distribution Algorithm
    Yu, Binghui
    Du, Zhiqiang
    2012 WORLD AUTOMATION CONGRESS (WAC), 2012,