共 50 条
- [22] Hybrid Simulation and GA for a Flexible Flow Shop Problem with Variable Processors and Re-entrant Flow APPLIED COMPUTER SCIENCES IN ENGINEERING, WEA 2018, PT I, 2018, 915 : 246 - 256
- [24] Bottleneck-Based Heuristic For Re-Entrant Flow Shop With Two Potential Dominant Machines CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 176 - 181
- [27] Heuristics for minimizing total completion time and maximum lateness on identical parallel machines with setup times Journal of Intelligent Manufacturing, 2010, 21 : 439 - 449
- [30] Green re-entrant hybrid flow shop scheduling problem considering multiple time factors Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2023, 29 (01): : 75 - 90