A Quality-Improvement Collaborative Project to Reduce Pressure Ulcers in PICUs

被引:69
|
作者
Visscher, Marty [1 ,6 ]
King, Alice [2 ,6 ]
Nie, Marie [2 ,6 ]
Schaffer, Pat [3 ]
Taylor, Teresa [3 ]
Pruitt, David [4 ,7 ]
Giaccone, Mary Jo [3 ]
Ashby, Marshall [5 ]
Keswani, Sundeep [2 ,6 ]
机构
[1] Cincinnati Childrens Hosp Med Ctr, Skin Sci Program, Cincinnati, OH 45229 USA
[2] Cincinnati Childrens Hosp Med Ctr, Pediatr Adv Wound Care & Skin Serv, Cincinnati, OH 45229 USA
[3] Cincinnati Childrens Hosp Med Ctr, Patient Serv, Cincinnati, OH 45229 USA
[4] Cincinnati Childrens Hosp Med Ctr, Cincinnati, OH 45229 USA
[5] Cincinnati Childrens Hosp Med Ctr, James M Anderson Ctr Hlth Syst Excellence, Cincinnati, OH 45229 USA
[6] Univ Cincinnati, Dept Surg, Cincinnati, OH 45267 USA
[7] Univ Cincinnati, Dept Pediatr, Cincinnati, OH 45267 USA
关键词
pressure ulcer; skin; wound; device; quality improvement; bundle; intervention; neonatal; ICU; INTENSIVE-CARE-UNIT; STRATUM-CORNEUM; SKIN INTEGRITY; SORES; RISK; PREVENTION; CHILDREN; TRAUMA; SCALE; WATER;
D O I
10.1542/peds.2012-1626
中图分类号
R72 [儿科学];
学科分类号
100202 ;
摘要
BACKGROUND AND OBJECTIVE: Pediatric patients are at risk for developing pressure ulcers (PUs) and associated pain, infection risk, and prolonged hospitalization. Stage III and IV ulcers are serious, reportable events. The objective of this study was to develop and implement a quality-improvement (QI) intervention to reduce PUs by 50% in our ICUs. METHODS: We established a QI collaborative leadership team, measured PU rates during an initial period of rapid-cycle tests of change, developed a QI bundle, and evaluated the PU rates after the QI implementation. The prospective study encompassed 1425 patients over 54 351 patient-days in the PICU and NICU. RESULTS: The PU rate in the PICU was 14.3/1000 patient-days during the QI development and 3.7/1000 patient-days after QI implementation (P < .05), achieving the aim of 50% reduction. The PICU rates of stages I, II, and III conventional and device-related PUs decreased after the QI intervention. The PU rate in the NICU did not change significantly over time but remained at a mean of 0.9/1000 patient-days. In the postimplementation period, 3 points were outside the control limits, primarily due to an increase in PUs associated with pulse oximeters and cannulas. CONCLUSIONS: The collaborative QI model was effective at reducing PUs in the PICU. Pediatric patients, particularly neonates, are at risk for device-related ulcers. Heightened awareness, early detection, and identification of strategies to mitigate device-related injury are necessary to further reduce PU rates.
引用
收藏
页码:E1950 / E1960
页数:11
相关论文
共 50 条
  • [41] Constipation following lower limb arthroplasty: a quality-improvement project
    Lockhart, J.
    ANAESTHESIA, 2018, 73 : 55 - 55
  • [42] Intravenous Access in Acute Gastrointestinal Bleeding: A Quality-Improvement Project
    Bilal, Mohammad
    Alhajjar, Osama
    Madisetty, Matthew
    Kapetanos, Anastasios
    Babich, Michael
    GASTROENTEROLOGY, 2016, 151 (01) : 196 - 197
  • [43] A Quality-Improvement Initiative to Reduce NICU Transfers for Neonates at Risk for Hypoglycemia
    LeBlanc, Sherry
    Haushalter, Jamie
    Seashore, Carl
    Wood, Karen S.
    Steiner, Michael J.
    Sutton, Ashley G.
    PEDIATRICS, 2018, 141 (03)
  • [44] Theatre overrun quality-improvement project of theatre efficiency at Hammersmith Hospital
    Imtiaz, Sana
    Matveeva, Larisa
    Kuczynski, Tomasz
    ANAESTHESIA, 2024, 79 : 39 - 39
  • [45] Bridging the gap between Foundation doctors and anaesthesia: a quality-improvement project
    Yan, R.
    Kumar, P.
    Henderson, C.
    Robertson, C.
    Urquhart, C.
    ANAESTHESIA, 2020, 75 : 63 - 63
  • [46] Review of chest radiography in the intensive care unit: a quality-improvement project
    Soto, K.
    Taylor, A.
    Austin, P.
    ANAESTHESIA, 2022, 77 : 34 - 34
  • [47] Opioid prescribing for major elective surgical patients: a quality-improvement project
    Lynch, S.
    Dipura, C.
    ANAESTHESIA, 2021, 76 : 57 - 57
  • [48] RESULTS OF A NALOXONE SCREENING QUALITY-IMPROVEMENT PROJECT IN AN ACADEMIC EMERGENCY DEPARTMENT
    Devries, Jennifer
    Rafie, Sally
    Ajayi, Toluwalase A.
    Kreshak, Allyson
    Edmonds, Kyle P.
    JOURNAL OF EMERGENCY MEDICINE, 2019, 56 (04): : 378 - 385
  • [49] A Quality-Improvement Project to Improve Diagnosis and Management of Chorioamnionitis on Labor and Delivery
    Neuhoff, Barbara K.
    Wells, Joshua
    Tufton, Anne
    Heath, Maya
    Olister, Staci
    Holman, Stacey L.
    OBSTETRICS AND GYNECOLOGY, 2022, 139 : 79S - 79S
  • [50] POP: pre-operative oral paracetamol quality-improvement project
    Riddle, D.
    Bennett, A.
    Wilkinson, A.
    ANAESTHESIA, 2024, 79 : 53 - 53