Minimizing makespan for parallel batch processing machines with non-identical job sizes using neural nets approach

被引:7
|
作者
Shao, Hao [1 ]
Chen, Hua-Ping [1 ]
Huang, George Q. [1 ]
Xu, Rui [1 ]
Cheng, Ba-yi [1 ]
Wang, Shuan-shi [1 ]
Liu, Bo-wen [1 ]
机构
[1] Univ Sci & Technol China, Dept Informat Management & Decis Sci, Anhua 230026, Peoples R China
关键词
D O I
10.1109/ICIEA.2008.4582854
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper aims at minimizing the makespan for parallel batch processing machines with non-identical job sizes (NPBM) using neural nets (NN) approach. NN approach was proved effective to solve combinatorial optimization problems but no application to NPBM problems hitherto. This research provides new methods to code the NN with the introduction of Master Weight Matrix (MWM). Computational experiments show that the NN approach outperforms other algorithms in various circumstances.
引用
收藏
页码:1921 / 1924
页数:4
相关论文
共 50 条
  • [31] Effective heuristic for makespan minimization in parallel batch machines with non-identical capacities
    Jia, Zhao-hong
    Li, Kai
    Leung, Joseph Y-T
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2015, 169 : 1 - 10
  • [32] Minimizing the makespan for different volume parallel batch-processing machines problem with release times and job sizes
    Wang, Hui-Mei
    Chou, Fuh-Der
    Huang, Chun-Ying
    ICPOM2008: PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE OF PRODUCTION AND OPERATION MANAGEMENT, VOLUMES 1-3, 2008, : 1509 - 1514
  • [33] Constrained binary artificial bee colony to minimize the makespan for single machine batch processing with non-identical job sizes
    Al-Salamah, Muhammad
    APPLIED SOFT COMPUTING, 2015, 29 : 379 - 385
  • [34] Integrated scheduling on parallel batch processing machines with non-identical capacities
    Jia, Zhao-hong
    Huo, Si-yun
    Li, Kai
    Chen, Hua-ping
    ENGINEERING OPTIMIZATION, 2020, 52 (04) : 715 - 730
  • [35] A genetic algorithm for scheduling parallel non-identical batch processing machines
    Xu, Shubin
    Bean, James C.
    2007 IEEE SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE IN SCHEDULING, 2007, : 143 - +
  • [36] Dynamic scheduling of batch-processing machines with non-identical product sizes
    Van Der Zee, D. J.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2007, 45 (10) : 2327 - 2349
  • [37] Minimizing the total completion time on a single batch processing machine with non-identical job sizes using ant colony optimization
    Xu, Rui
    Chen, Hua-Ping
    Huang, George Q.
    Shao, Hao
    Cheng, Ba-Yi
    Liu, Bo-Wen
    ICIEA 2008: 3RD IEEE CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS, PROCEEDINGS, VOLS 1-3, 2008, : 2211 - 2215
  • [38] Scheduling a batch processing machine with non-identical job sizes: a clustering perspective
    Chen, Huaping
    Du, Bing
    Huang, George Q.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (19) : 5755 - 5778
  • [39] An effective discrete differential evolution algorithm for scheduling uniform parallel batch processing machines with non-identical capacities and arbitrary job sizes
    Zhou, Shengchao
    Liu, Ming
    Chen, Huaping
    Li, Xueping
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2016, 179 : 1 - 11
  • [40] An improved meta-heuristic for makespan minimization of a single batch machine with non-identical job sizes
    Jia, Zhao-hong
    Leung, Joseph Y. -T.
    COMPUTERS & OPERATIONS RESEARCH, 2014, 46 : 49 - 58